Skip to main content

VÖGELE and Hamm race to the finish line at Gardermoen Raceway

A professional drag race takes only a few seconds. But in these brief moments, everything – including the track surface – must be absolutely perfect. Apart from having excellent grip, the track must also be completely even. So, when Stange Asfalt was rehabilitating the Gardermoen Raceway near Oslo - Norway’s only permanent dragstrip – the company used state-of-the-art equipment supplied by VÖGELE and Hamm. On the dragstrip, the drivers accelerate up to top speeds of more than 500kph within seconds. After
March 28, 2017 Read time: 2 mins
Maximum precision was called for when paving Gardermoen Raceway near Oslo
A professional drag race takes only a few seconds. But in these brief moments, everything – including the track surface – must be absolutely perfect.

Apart from having excellent grip, the track must also be completely even. So, when Stange Asfalt was rehabilitating the Gardermoen Raceway near Oslo - Norway’s only permanent dragstrip – the company used state-of-the-art equipment supplied by VÖGELE and 228 Hamm.

On the dragstrip, the drivers accelerate up to top speeds of more than 500kph within seconds. After a quarter of a mile – around 400m - the race is already over and the braking parachute is deployed. For this reason the track itself must meet stringent evenness requirements. The tolerance range on the Gardermoen Raceway was only ± 2mm across a width of 4.5m and a crown with a slope of exactly +1° was specified.

To achieve this, Stange Asfalt opted to use a SUPER 1900-3i working with two VÖGELE multi-cell sonic sensors for grade and slope control. To guarantee continuous paving without interruption, a VÖGELE PowerFeeder type MT 3000-2i Ofiset was used for material feed.

Next, Hamm DV 70 VO and DV 90 VO rollers - each equipped with vibratory and oscillating drums - compacted all three layers of the new asphalt pavement. The quality of the machines and the experience of the Stange Asfalt team in meeting exacting quality levels meant everyone was a winner at Gardermoen Raceway.

For more information on companies in this article

Related Content

  • Paving a new racing circuit
    February 2, 2022
    The use of reduced temperature asphalt in a road construction project in Germany has helped to lower emissions
  • Paving giant in action
    February 20, 2012
    The project to build a new orbital motorway to bypass the Spanish city of Barcelona has benefited from the use of the world's largest asphalt paver. This represents one of the first jobs in Europe for the power paver, Vögele's SUPER 3000-2, which was first launched at the Bauma exhibition in Munich in 2010.
  • Novel dual layer paving work in Germany
    February 2, 2017
    A German contractor is now using two novel asphalt paving technologies from Vögele together for key projects The firm has acquired Vögele’s InLine Pave equipment with its innovative dual layer paving technology as well as one of the SUPER 1800-3i SprayJets for paving a surface course. This combination of technologies is allowing contractor Rask Brandenburg to carry out fast and efficient road rehabilitation work on some major routes, including a busy Autobahn stretch leading into capital Berlin. T
  • Wirtgen fleet helps build Romanian road
    December 17, 2013
    A fleet of Wirtgen machines is helping build a section of a major highway in Romania, the Transylvanian Autostrada A3. This 588km road connects Romanian capital Bucharest with the Hungarian border and links to the Hungarian M4 highway. Plans for the A3 got the go-ahead in 2004 and the route runs via Ploieti, Braov, Sighioara, Târgu Mure, Cluj-Napoca, Zalau and Oradea to the Hungarian border, with completion scheduled for 2017.