Skip to main content

VÖGELE and Hamm race to the finish line at Gardermoen Raceway

A professional drag race takes only a few seconds. But in these brief moments, everything – including the track surface – must be absolutely perfect. Apart from having excellent grip, the track must also be completely even. So, when Stange Asfalt was rehabilitating the Gardermoen Raceway near Oslo - Norway’s only permanent dragstrip – the company used state-of-the-art equipment supplied by VÖGELE and Hamm. On the dragstrip, the drivers accelerate up to top speeds of more than 500kph within seconds. After
March 28, 2017 Read time: 2 mins
Maximum precision was called for when paving Gardermoen Raceway near Oslo
A professional drag race takes only a few seconds. But in these brief moments, everything – including the track surface – must be absolutely perfect.

Apart from having excellent grip, the track must also be completely even. So, when Stange Asfalt was rehabilitating the Gardermoen Raceway near Oslo - Norway’s only permanent dragstrip – the company used state-of-the-art equipment supplied by VÖGELE and 228 Hamm.

On the dragstrip, the drivers accelerate up to top speeds of more than 500kph within seconds. After a quarter of a mile – around 400m - the race is already over and the braking parachute is deployed. For this reason the track itself must meet stringent evenness requirements. The tolerance range on the Gardermoen Raceway was only ± 2mm across a width of 4.5m and a crown with a slope of exactly +1° was specified.

To achieve this, Stange Asfalt opted to use a SUPER 1900-3i working with two VÖGELE multi-cell sonic sensors for grade and slope control. To guarantee continuous paving without interruption, a VÖGELE PowerFeeder type MT 3000-2i Ofiset was used for material feed.

Next, Hamm DV 70 VO and DV 90 VO rollers - each equipped with vibratory and oscillating drums - compacted all three layers of the new asphalt pavement. The quality of the machines and the experience of the Stange Asfalt team in meeting exacting quality levels meant everyone was a winner at Gardermoen Raceway.

For more information on companies in this article

Related Content

  • In the fast lane at Indian F1 track
    June 21, 2012
    India’s new Formula 1 motor racing circuit, with its tight construction tolerances, demands considerable driving skill. More than 500 million people worldwide watched the first Formula 1 motor race in India's history. The drivers were thrilled by the new asphalt circuit with its numerous bends and the peripheral area around the new race track at Greater Noida near the capital New Delhi, which were built by machinery from German company Vögele (a member of the Wirtgen Group). Working with four Super 1800-
  • Wirtgen: low-emission recycling near Legoland
    March 22, 2024
    Wirtgen, Vögele and Hamm were on a section of the busy E45 highway close to the famous Legoland resort at Billlund, Denmark.
  • Race track construction in Japan
    March 13, 2024

    Road construction machines from the Wirtgen Group have been used to build a new race track in Japan. Four Vögele asphalt pavers worked on the project to build a demanding circuit in a mountainous area in Japan.

    Tight corners and uphill gradients of up to 19% are features of the private racing circuit. Three Vögele pavers, a SUPER 1800-3i, a SUPER 1803-3i and a SUPER 1900-2, paved almost 100,000m2 in four layers, while a MT 3000-3i offset material feeder was also used to ensure efficiency and quality.

  • Accurate milling and paving with Wirtgen
    March 15, 2022
    Equipment from the Wirtgen Group, including equipment from Vögele, Hamm and Benninghoven, have been used to resurface the Silverstone circuit