Skip to main content

Thermal Road Repair’s updated pavement heater is now automatic

Aidan Conway, founder of Thermal Road Repairs, the UK manufacture of paver-mounted pavement heaters, explains how the latest version operates. The equipment, which allows asphalt to be laid seamlessly, eliminates joints from the outset. The latest version of the paver-mounted pavement heater from Thermal Road Repairs includes start-stop technology. This allows the computerised equipment to operate independently while synchronising with the paver. In TRR’s original system this was a manual process, explains
August 7, 2017 Read time: 4 mins
Aidan Conway, co-founder of Thermal Road Repairs
Aidan Conway, founder of Thermal Road Repairs, the UK manufacture of paver-mounted pavement heaters, explains how the latest version operates.


The equipment, which allows asphalt to be laid seamlessly, eliminates joints from the outset. The latest version of the paver-mounted pavement heater from 8543 Thermal Road Repairs includes start-stop technology. This allows the computerised equipment to operate independently while synchronising with the paver.

In TRR’s original system this was a manual process, explains Aidan Conway, a founder of the small start-up company in northwest England. It was very difficult to accurately determine the exact moment to cut off the heat. The answer has been to automate the process.

Once the surface reaches a specified temperature heat is automatically dispelled through fans, maintaining a high-quality surface finish and averting damage caused from over-heating. The paver continues to advance only once the ground temperature has reached an optimum level again.

The concept for the company was initiated in 2012 following 8100 Highways England’s need to find a permanent solution to the joint failures in asphalt surfaces that plague roads across the country.

The company spent two years researching and developing the system and since launching the first machine in 2014 it has expanded our portfolio to ensure joints are completely eradicated in asphalt surfaces, whether TRR machines are being used to patch a pothole or when laying an entire carriageway or runway.

Aidan Conway explains further:

How long does it take to reach operating temperature?

“Around one minute depending on ambient temperatures and the type of material being heated. Just as important is the unit's ability to dissipate heat in the event of the cessation of the forward motion of the paver. This fundamentally protects the road surface.”

What temperatures does it reach?

“The unit can emit heat up to 500°C. However, the sensors match the forward pace of the heater with desired joint temperature. If the system exceeds a desired pre-set temperature on the joint, the heat backs off automatically. The unit produces consistently heated material at a controlled temperature going into the screed. The way our system transfers heat into asphalt results in temperature retention in the material through compaction.”

How much does it weigh?

“The unit itself weights 68kg and is fully demountable. It fits onto a specially-made mounting bracket on the paver and doesn’t affect normal operations around the paving machine.”

What type of fuel does it use?


“LPG [liquefied petroleum gas; called Autogas, GPL and GLP in some European countries].”

How long does it take to mount on a machine?

“Average of five minutes.”

What special provisions are needed when installing it on a machine?

“None, other than the mounting of the bracket and provision of gas. Further to this, 2394 Volvo and 2395 Wirtgen have worked with us to develop relays to allow our kit to synchronise with theirs. The rest of the system is installed using quick-release plugs to allow for a minimal set up time.”

How long does it take to heat up the joint area?

“Around one to two minutes, depending on ambient temperature. More importantly, there is no impact on laying speeds so operational output is not negatively affected.”

How long will it take to make a return on the investment?

“The unit cost would depend on paver make and model but would include our stop/start synchronisation system. Return on investment is short as no other joint treatments such as modified bitumen, emulsion or cold pour materials are required. The true cost is insignificant compared to a failed joint.”

Can customers either rent or buy the unit?

“Customers can rent, lease or buy. Our UK customers which have them already installed include Tarmac National Contracting, Associated Asphalt, Breedon Contracting, Colas, Lagan Construction, Gibbs Surfacing and Thomas Bow City Asphalt.”

For more information on companies in this article

Related Content

  • Machine control technology allows more efficient paving
    March 3, 2015
    In the US, a specialist contractor is making savings with new 3D technology for concrete paving. US contractor Gehring Construction is a specialist in concrete paving and is a long-time customer of GOMACO. Having bought its first GOMACO unit in 1973, Gehring has a good deal of experience in this segment. The company is now using some of the latest machine control technology, having bought a Topcon Millimetre GPS 3D stringless system, which has been used on a bypass project around the US city of Colombus. T
  • Special concrete paver for UK road job
    January 5, 2015
    A specially adapted Wirtgen SP25i concrete slipformer has been used on the M6 motorway near Cannock in the UK. The machine worked together with a Wirtgen ISF25i (independent side feeder) in order to pave a concrete slab under difficult conditions. With an overall length of 373km, the M6 is the longest and one of the most heavily congested motorways in the UK. The M6 connects the M1 motorway near Rugby with Carlisle near the Scottish border. But due to the steadily growing volume of traffic, the Highways
  • New equipment for materials testing
    January 13, 2014
    Leading formwork manufacturers have secured some impressive contracts in Africa, as the continent’s transport infrastructure continues to improve at a rapid pace. Meanwhile, other bridgework equipment companies are also seeing their products in demand in Africa, as well as North America and Australia. Guy Woodford reports
  • Kids in Cars: from curious to furious during the summer road trip
    August 20, 2015
    Kids start to complain about the amount of time in a car after two 2 and 23 minutes of driving, according to research in the UK. Around that time, the driver will hear from the back seat the first of a long list of complaints: “Are we nearly there yet?” And by 2 hours and 37 minutes, angry rows have broken out. These squabbles are almost inevitable, noted the study from the UK’s Highways England. Nearly 80% of families say kids quarrel during long-distance summer trips. Many parents said this ha