Skip to main content

Thermal Road Repair’s updated pavement heater is now automatic

Aidan Conway, founder of Thermal Road Repairs, the UK manufacture of paver-mounted pavement heaters, explains how the latest version operates. The equipment, which allows asphalt to be laid seamlessly, eliminates joints from the outset. The latest version of the paver-mounted pavement heater from Thermal Road Repairs includes start-stop technology. This allows the computerised equipment to operate independently while synchronising with the paver. In TRR’s original system this was a manual process, explains
August 7, 2017 Read time: 4 mins
Aidan Conway, co-founder of Thermal Road Repairs
Aidan Conway, founder of Thermal Road Repairs, the UK manufacture of paver-mounted pavement heaters, explains how the latest version operates.


The equipment, which allows asphalt to be laid seamlessly, eliminates joints from the outset. The latest version of the paver-mounted pavement heater from 8543 Thermal Road Repairs includes start-stop technology. This allows the computerised equipment to operate independently while synchronising with the paver.

In TRR’s original system this was a manual process, explains Aidan Conway, a founder of the small start-up company in northwest England. It was very difficult to accurately determine the exact moment to cut off the heat. The answer has been to automate the process.

Once the surface reaches a specified temperature heat is automatically dispelled through fans, maintaining a high-quality surface finish and averting damage caused from over-heating. The paver continues to advance only once the ground temperature has reached an optimum level again.

The concept for the company was initiated in 2012 following 8100 Highways England’s need to find a permanent solution to the joint failures in asphalt surfaces that plague roads across the country.

The company spent two years researching and developing the system and since launching the first machine in 2014 it has expanded our portfolio to ensure joints are completely eradicated in asphalt surfaces, whether TRR machines are being used to patch a pothole or when laying an entire carriageway or runway.

Aidan Conway explains further:

How long does it take to reach operating temperature?

“Around one minute depending on ambient temperatures and the type of material being heated. Just as important is the unit's ability to dissipate heat in the event of the cessation of the forward motion of the paver. This fundamentally protects the road surface.”

What temperatures does it reach?

“The unit can emit heat up to 500°C. However, the sensors match the forward pace of the heater with desired joint temperature. If the system exceeds a desired pre-set temperature on the joint, the heat backs off automatically. The unit produces consistently heated material at a controlled temperature going into the screed. The way our system transfers heat into asphalt results in temperature retention in the material through compaction.”

How much does it weigh?

“The unit itself weights 68kg and is fully demountable. It fits onto a specially-made mounting bracket on the paver and doesn’t affect normal operations around the paving machine.”

What type of fuel does it use?


“LPG [liquefied petroleum gas; called Autogas, GPL and GLP in some European countries].”

How long does it take to mount on a machine?

“Average of five minutes.”

What special provisions are needed when installing it on a machine?

“None, other than the mounting of the bracket and provision of gas. Further to this, 2394 Volvo and 2395 Wirtgen have worked with us to develop relays to allow our kit to synchronise with theirs. The rest of the system is installed using quick-release plugs to allow for a minimal set up time.”

How long does it take to heat up the joint area?

“Around one to two minutes, depending on ambient temperature. More importantly, there is no impact on laying speeds so operational output is not negatively affected.”

How long will it take to make a return on the investment?

“The unit cost would depend on paver make and model but would include our stop/start synchronisation system. Return on investment is short as no other joint treatments such as modified bitumen, emulsion or cold pour materials are required. The true cost is insignificant compared to a failed joint.”

Can customers either rent or buy the unit?

“Customers can rent, lease or buy. Our UK customers which have them already installed include Tarmac National Contracting, Associated Asphalt, Breedon Contracting, Colas, Lagan Construction, Gibbs Surfacing and Thomas Bow City Asphalt.”

For more information on companies in this article

Related Content

  • Foaming option
    July 16, 2012
    Foamed bitumen is a versatile and cost-effective tool in recycling roads - Mike Woof reports Wirtgen hopes to capitalise on the growing demand for materials recycling and its range of solutions for this sector has expanded considerably in recent times. The firm has been taking advantage of further developments in foamed bitumen technology to offer an array of cost-effective road repair solutions. The range allows this material to be used in array of cold recycling applications and Wirtgen also offers labora
  • Developments in the concrete pavers market
    February 20, 2012
    The market for concrete pavers continues to fuel research and development into new models writes Mike Woof. The range and breadth of concrete slipforming and paving equipment on the market continues to grow as firms develop new and improved models. Prior to the recent CONEXPO-CON/AGG 2011 construction equipment show in Las Vegas, some of the best known manufacturers had already announced their new and improved slipforming machines. GOMACO, Guntert & Zimmermann, Power Curbers and Wirtgen all had recent or ne
  • Warm mix asphalt offers green solution
    September 4, 2019
    A new report from the UK highlights that utilising warm mix asphalt (WMA) can help cut CO2 emissions. The All-Party Parliamentary Group on Highways has issued a report highlighting how the use of WMA can reduce carbon emissions and improve efficiencies on highways projects. WMAs are manufactured and laid at lower temperatures than traditional asphalts, using less energy and delivering carbon savings without compromising performance. Their use can reduce CO2 emissions associated with asphalt production for
  • Low temperature asphalt and aggregate options’
    February 7, 2014
    At what point does ‘some technology’ become ‘enough technology’? Less than four years ago industry publications were filled with a persistent message, the reluctance of UK based contractors to adopt machine control to the same extent as near European neighbours, particularly close ones such as Ireland and Holland. However from 2009 onwards we have seen a huge shift in demand for machine control as the success of high profile road and rail jobs such as the M25 widening scheme and Airdrie – Bathgate rail