Skip to main content

Thermal Road Repair’s updated pavement heater is now automatic

Aidan Conway, founder of Thermal Road Repairs, the UK manufacture of paver-mounted pavement heaters, explains how the latest version operates. The equipment, which allows asphalt to be laid seamlessly, eliminates joints from the outset. The latest version of the paver-mounted pavement heater from Thermal Road Repairs includes start-stop technology. This allows the computerised equipment to operate independently while synchronising with the paver. In TRR’s original system this was a manual process, explains
August 7, 2017 Read time: 4 mins
Aidan Conway, co-founder of Thermal Road Repairs
Aidan Conway, founder of Thermal Road Repairs, the UK manufacture of paver-mounted pavement heaters, explains how the latest version operates.


The equipment, which allows asphalt to be laid seamlessly, eliminates joints from the outset. The latest version of the paver-mounted pavement heater from 8543 Thermal Road Repairs includes start-stop technology. This allows the computerised equipment to operate independently while synchronising with the paver.

In TRR’s original system this was a manual process, explains Aidan Conway, a founder of the small start-up company in northwest England. It was very difficult to accurately determine the exact moment to cut off the heat. The answer has been to automate the process.

Once the surface reaches a specified temperature heat is automatically dispelled through fans, maintaining a high-quality surface finish and averting damage caused from over-heating. The paver continues to advance only once the ground temperature has reached an optimum level again.

The concept for the company was initiated in 2012 following 8100 Highways England’s need to find a permanent solution to the joint failures in asphalt surfaces that plague roads across the country.

The company spent two years researching and developing the system and since launching the first machine in 2014 it has expanded our portfolio to ensure joints are completely eradicated in asphalt surfaces, whether TRR machines are being used to patch a pothole or when laying an entire carriageway or runway.

Aidan Conway explains further:

How long does it take to reach operating temperature?

“Around one minute depending on ambient temperatures and the type of material being heated. Just as important is the unit's ability to dissipate heat in the event of the cessation of the forward motion of the paver. This fundamentally protects the road surface.”

What temperatures does it reach?

“The unit can emit heat up to 500°C. However, the sensors match the forward pace of the heater with desired joint temperature. If the system exceeds a desired pre-set temperature on the joint, the heat backs off automatically. The unit produces consistently heated material at a controlled temperature going into the screed. The way our system transfers heat into asphalt results in temperature retention in the material through compaction.”

How much does it weigh?

“The unit itself weights 68kg and is fully demountable. It fits onto a specially-made mounting bracket on the paver and doesn’t affect normal operations around the paving machine.”

What type of fuel does it use?


“LPG [liquefied petroleum gas; called Autogas, GPL and GLP in some European countries].”

How long does it take to mount on a machine?

“Average of five minutes.”

What special provisions are needed when installing it on a machine?

“None, other than the mounting of the bracket and provision of gas. Further to this, 2394 Volvo and 2395 Wirtgen have worked with us to develop relays to allow our kit to synchronise with theirs. The rest of the system is installed using quick-release plugs to allow for a minimal set up time.”

How long does it take to heat up the joint area?

“Around one to two minutes, depending on ambient temperature. More importantly, there is no impact on laying speeds so operational output is not negatively affected.”

How long will it take to make a return on the investment?

“The unit cost would depend on paver make and model but would include our stop/start synchronisation system. Return on investment is short as no other joint treatments such as modified bitumen, emulsion or cold pour materials are required. The true cost is insignificant compared to a failed joint.”

Can customers either rent or buy the unit?

“Customers can rent, lease or buy. Our UK customers which have them already installed include Tarmac National Contracting, Associated Asphalt, Breedon Contracting, Colas, Lagan Construction, Gibbs Surfacing and Thomas Bow City Asphalt.”

For more information on companies in this article

Related Content

  • Accurate road scanning with WDM
    January 24, 2022
    UK firm WDM has developed an innovative road assessment vehicle (RAV), capable of carrying out accurate surveys quickly. The RAV is equipped with an array of sensors that allow it to measure the various parameters needed to meet the UK SCANNER specification.
  • Materials testing developments include a new in-depth training service
    April 4, 2014
    Among the new developments in materials testing highlighted this month is a brand new idea from one manufacturer: in-depth training to help upskill technicians in developing countries - Kristina Smith reports CONTROLS has added another dimension to its business with the launch of a specialist training service: CONTROLS Academy Centre. In what the construction testing equipment manufacturer believes is a first for the industry, CONTROLS will be providing in-depth theoretical and practical training to thos
  • A fresh breath of air
    July 16, 2012
    With a new wave of exhaust emission regulations coming shortly, engine manufacturers are well on track to develop new solutions as Mike Woof reports A wave of technological advances has made the current generation of diesels the cleanest industrial engines ever produced. Driven by tightening controls on emissions, manufacturers have had to develop an array of innovative solutions that will help cut particulate and NOx being emitted from the tailpipe. When the phased reduction in exhaust emissions was first
  • Atkins, Jacobs and PwC to advise on RIS3
    December 27, 2022
    The three consultancies will help England’s National Highways agency develop a business plan for its third five-year Road Investment Strategy plan, RIS3.