Skip to main content

Sri Lanka Airport runway upgrade

Sri Lanka’s main international airport now features a new runway surface that will help improve air transport efficiency at the facility The project was carried out successfully, despite a tough time schedule, boosting safety at the airport. This new runway will help increase capacity at the airport, allowing Sri Lanka to develop the tourist sector on which the country depends heavily for its economic growth. The work at the international airport for Sri Lanka’s capital Colombo was carried out with the
December 7, 2017 Read time: 2 mins
Eight Dynapac twin drum rollers worked behind the pavers to bring the mat to the necessary compaction specification

Sri Lanka’s main international airport now features a new runway surface that will help improve air transport efficiency at the facility

The project was carried out successfully, despite a tough time schedule, boosting safety at the airport. This new runway will help increase capacity at the airport, allowing Sri Lanka to develop the tourist sector on which the country depends heavily for its economic growth.

The work at the international airport for Sri Lanka’s capital Colombo was carried out with the help of compaction and paving equipment from 206 Dynapac. The reconstruction of the runway at Colombo Bandaranaike International Airport was completed successfully ahead of schedule and has helped to improve the aviation facilities in Sri Lanka greatly, according to the client.

Because this reconstruction project was prioritised as an important transportation hub for the China Belt & Road Initiative, it was carried out by the Chinese contractor, China National Aero-Technology International Engineering Crop (AVIC-ENG). This contractor specialises in carrying out work outside of China, including construction activities. The firm utilised eight Dynapac twin drum compactors rollers; five of the CC522 models and three of the CC624 units. These asphalt compactors operated behind the four Dynapac pavers; two SD2530CS and two SD2550 models. These machines were able to lay the asphalt and compact it to the tight specification required by the client, ahead of the original time schedule.

Work started on the project at the beginning of 2017 and the job was initially expected to be complete by April 6th 2017. However, the main runway construction was finished before the end of March 2017 due to the efficiency of the contractor’s operations and also the dependability of the equipment and the support provided. Working day and night, the paving crew was able to operate at high speed while delivering a precise finish.

For more information on companies in this article

Related Content

  • Volvo CE Pavers working in Montana
    June 23, 2015
    Based in Montana, contractor Century Companies is now benefiting from an updated fleet of asphalt paving machines from Volvo CE. The company has operated Volvo CE’s Blaw-Knox pavers for many years and also has two Blaw-Knox PF510s, two PF3200s and a PF410 as well as Volvo DD70, DD118 and DD25B double drum compactors. However it has now added two of the 3m class P7110 tracked machines to its fleet. These were used on a job some 16km from the North Dakota border on the periphery of the Bakken Formation. This
  • Urban resurfacing on tracks with Caterpillar Paving
    July 9, 2024
    A UK contractor is making good use of its latest Caterpillar’s Cat Mobil-Trac paver for urban resurfacing works – Mike Woof reports
  • Autonomous soil compactor used in Canada
    November 8, 2023
    An autonomous Dynapac soil compactor equipped with Trimble technology has been used in Canada.
  • Innovative machine control systems for Canadian slipforming work
    November 29, 2013
    Advanced machine control technologies are speeding site layout and construction operations Canadian house building firm Mattamy Homes has brought in a contractor that has used sophisticated equipment to build the roads around its new development in Oakville, Ontario. The site is just 30 minutes drive from Toronto. Phase 1-A of the project is under construction and nearly every one of the 550 homes that will be built there has been sold already. Additional phases will bring the total number of homes to 1,800