Skip to main content

Sri Lanka Airport runway upgrade

Sri Lanka’s main international airport now features a new runway surface that will help improve air transport efficiency at the facility The project was carried out successfully, despite a tough time schedule, boosting safety at the airport. This new runway will help increase capacity at the airport, allowing Sri Lanka to develop the tourist sector on which the country depends heavily for its economic growth. The work at the international airport for Sri Lanka’s capital Colombo was carried out with the
December 7, 2017 Read time: 2 mins
Eight Dynapac twin drum rollers worked behind the pavers to bring the mat to the necessary compaction specification

Sri Lanka’s main international airport now features a new runway surface that will help improve air transport efficiency at the facility

The project was carried out successfully, despite a tough time schedule, boosting safety at the airport. This new runway will help increase capacity at the airport, allowing Sri Lanka to develop the tourist sector on which the country depends heavily for its economic growth.

The work at the international airport for Sri Lanka’s capital Colombo was carried out with the help of compaction and paving equipment from 206 Dynapac. The reconstruction of the runway at Colombo Bandaranaike International Airport was completed successfully ahead of schedule and has helped to improve the aviation facilities in Sri Lanka greatly, according to the client.

Because this reconstruction project was prioritised as an important transportation hub for the China Belt & Road Initiative, it was carried out by the Chinese contractor, China National Aero-Technology International Engineering Crop (AVIC-ENG). This contractor specialises in carrying out work outside of China, including construction activities. The firm utilised eight Dynapac twin drum compactors rollers; five of the CC522 models and three of the CC624 units. These asphalt compactors operated behind the four Dynapac pavers; two SD2530CS and two SD2550 models. These machines were able to lay the asphalt and compact it to the tight specification required by the client, ahead of the original time schedule.

Work started on the project at the beginning of 2017 and the job was initially expected to be complete by April 6th 2017. However, the main runway construction was finished before the end of March 2017 due to the efficiency of the contractor’s operations and also the dependability of the equipment and the support provided. Working day and night, the paving crew was able to operate at high speed while delivering a precise finish.

For more information on companies in this article

Related Content

  • Asphalt paving is seeing innovative new technology
    April 4, 2013
    With new machines coming to market, the asphalt paving sector is seeing an array of sophisticated technology now available
  • Granite pilots Volvo’s Compact Assist to new heights in Sacramento
    November 9, 2017
    While not required for its Sacramento Airport contract, Granite Construction* is getting to grips with IC specifications thanks to Volvo CE’s Compact Assist. In the US, 23 states have written intelligent compaction (IC) specifications for asphalt paving jobs and more states are expected to follow. Among those states with IC specs is California.
  • New asphalt pavers deliver better surface quality
    February 13, 2012
    Progressive paving improvements are offering better surface quality
  • Jakarta Airport taxiway upgrade
    June 7, 2019
    Equipment from German firm Bauer has been used to help upgrade facilities at Jakarta Airport in Indonesia. The Soekarno-Hatta International Airport is located in Cengkareng, Banten, a suburb of the Indonesia’s capital city, Jakarta, is one of the largest airports in Asia. Handling around 63 million passengers in 2017 and over 447,000 flight movements/year, the aircraft handling facilities were becoming too crowded. The answer was to construct a new connecting taxiway linking the existing runways at the eas