Skip to main content

Paving tight corners on a racetrack

Vögele SUPER 1303-3i pavers have been used with great success on a challenging job site in Hemer, in Germany’s North-Rhine Westphalia. The machines were used in the construction of a new karting track. The contractor employed Vögele equipment for this project, paving tight bends over a length of 391.5m.
May 12, 2021 Read time: 3 mins
From above, the track shows how manoeuvrable the paver had to be

The track was built at the new headquarters of a global market leader for electric and petrol-driven go-karts. As a result, the quality of the track had to be first rate. This made the Hemer jobsite at the headquarters of RiMO Germany a serious challenge.

The work was handled by road contractor Ossenberg Aufbereitung, Straßen- und Tiefbau, using two of its Vögele SUPER 1303-3i wheeled pavers. Seven hairpin bends with a crossfall of up to 20% and a chicane resulted in a circuit in the northern area of Sauerland that demands skill from those driving the go-karts. Although the course has  been designed primarily for testing go-karts, its use is also available to locals as a leisure facility.

The track varies in width from 5.2-9.5m. At the widest points, the paving team also used a Vögele SUPER 1803-2 Universal Class paver. A key factor in achieving a quality result was the use of a wheeled machine for the tight corners.

Wheeled pavers have advantages when paving tight bends as they can steer with precision and the 6x4 drive also helps to maximise grip. The Vögele machine runs on two pneumatic rear tyres and four front wheels mounted on bogies, a layout that also copes with surface irregularities. The Pivot Steer function on the Vögele wheeled machines played an important role in achieving accurate paving on the tight curves. The steering brake automatically brakes the rear wheel on the inside of the bend hydraulically. The system helps to draw the machine round the bend, allowing much tighter turning circles. The system is useful for paving on cramped jobsites such as inner-city building projects as well as racing circuits.

The Vögele machine was able to cope with the tight corners for the track
The Vögele machine was able to cope with the tight corners for the track

Paving was performed hot-to-hot to maximise quality. This is because the more bends a track has, the greater the benefit of the smallest possible pave width. This ensures that the auger always transfers the right quantity of material to the full width being paved, even with a series of left- and right-hand bends as well as tight curves. This delivered a track that met specifications across the full pave width. In the process, Extending Screed AB 340 TV provided quality surfaces, as well as a high degree of evenness, ensuring that go-kart drivers will not lose contact with the ground in future.

Supplying mix on the jobsite was a challenge: it was impossible for large trucks to drive around on the site, so a Vögele MT 3000-2i Offset material feeder was positioned close to the entrance where it was able to receive material from the mix truck. As soon as the two SUPER 1303-3i machines were working within range of the MT 3000-2i Offset, the material feeder used its pivoting conveyor to transfer mix to the paver hoppers. At all other points, the asphalt was transferred to wheeled loaders which then transported it to the pavers.

For more information on companies in this article

Related Content

  • Wirtgen paving technology takes off at Frankfurt
    February 27, 2017
    Time was at a premium for Wirtgen machinery when resurfacing the runway at Frankfurt/Main Airport Europe’s third largest airport, Frankfurt/Main, has new surface course on runways about every seven year, including the centre runway, the most-frequently used section.
  • Vögele sets paving record in German capital
    September 16, 2015
    Material transfer vehicles and remixing systems are crucial to delivering quality paving. Using material transfer vehicles (MTVs) can play a major role in delivering high quality road surfaces. These units can help boost quality by minimising the risk of material or thermal segregation. A major road paving project has been carried out in Germany using innovative paving methods. For the first time ever, binder and surface courses were paved over a width of 15.5m. This paving job was carried out on a 4.2km st
  • Smart road surfacing in a tunnel
    August 19, 2022
    Smart road construction techniques have been used in the widest tunnel in Switzerland. Efficient operation and logistics were required for paving a width of 11.5m in the Gubrist Tunnel and contractor Marti AG Solothurn Bauunternehmung made good use of Vögele’s WITOS Paving Plus technology to optimise its work on the project.
  • Vögele MT 3000-2 for Austria A2 motorway
    May 14, 2014
    Road construction work with moving traffic always represents a major challenge. This is especially true when only one lane can be closed, consequently leaving little space for working and manoeuvring. That was exactly the case for a rehabilitation project on the A2 motorway in Austria between Vienna and Graz near Schäffern. However, the job was further complicated by another factor: all access roads to the job site were roughly 1km apart. Ensuring an uninterrupted supply of mix to the paver under these