Skip to main content

Oklahoma highway surface upgrade

A milling and paving project has provided a necessary surface upgrade for a busy stretch of highway in Oklahoma US Route 62 is an important route and runs 3,597km from the Mexico-US border at El Paso, Texas, to Niagara Falls, New York, on the Canada–US border. A 12km section of the road where it runs through in Oklahoma recently received a rehab. The Oklahoma Department of Transportation (ODOT) project started in Blanchard, Oklahoma, and headed west. This stretch was built in 2000 when ODOT was switc
February 2, 2017 Read time: 3 mins
MOBA sensor equipment was used on the paver to ensure requirements were met
A milling and paving project has provided a necessary surface upgrade for a busy stretch of highway in Oklahoma

US Route 62 is an important route and runs 3,597km from the Mexico-US border at El Paso, Texas, to Niagara Falls, New York, on the Canada–US border.

A 12km section of the road where it runs through in Oklahoma recently received a rehab. The 5295 Oklahoma Department of Transportation (ODOT) project started in Blanchard, Oklahoma, and headed west. This stretch was built in 2000 when ODOT was switching from conventional Hot Mix Asphalt (HMA) to Superpave. However the mix was not an optimum design and the section of road did not last as anticipated, showing premature wear and deterioration.

It was clear that it had to be replaced, so local firm Markwell Paving was awarded the contract for the road improvement project. The company used its 1252 Roadtec RX-700e heavy-duty milling machine, equipped with a 3.2m-wide cutter drum, cutting to a depth of 51mm. For the paving work the firm placed a 51mm lift of a locally-sourced RIL (Ridge Intermediate Layer) course on top of the milled surface to improve binding with the top two layers of HMA.

The company used its Roadtec SP-100e Stealth paver on the US 62 highway rehab project. The paver worked in tandem with a Roadtec SB-2500e Shuttle Buggy material transfer vehicle (MTV), to ensure a steady flow of HMA to the paver. Markwell placed a 51mm lift of Oklahoma S4 Superpave mix surface course on top of the base course. And the SP-100e Stealth paver then placed Oklahoma S5 Superpave HMA.

ODOT has studied and tested the thermal cracking resistance of the Oklahoma S4 and Oklahoma S5 HMA mixes and found them to be stiffer, as indicated by higher creep compliance and indirect tensile strength values. Markwell Paving used the HMA mixes specified by ODOT to meet requirements.

The contractor used 1228 MOBA sensor equipment to monitor progress during the project and ensure it remained within the specifications set by the client. As a result, the firm beat the ODOT smoothness test and believes the stretch of road is now one of the smoothest sections of US Route 62 as a result.

For more information on companies in this article

Related Content

  • Astec’s Shuttle Buggy lands in Australia
    March 5, 2024
    Performance reliability of the Roadtec SB-3000 Material Transfer Vehicle was a key factor in the contractor Boral’s decision to use it for paving work on the Western Sydney Airport Project.
  • Podium finish for Indonesia’s new racetrack paver
    November 23, 2021
    The first machines to complete a circuit of Indonesia’s new Mandalika International motorsport track were a series of Bomag pavers and rollers. They can claim a best-in-class finish when it comes to creating the ultimate surface for a competitive racing track.
  • Hot-to-hot paving upgrades Bremen City Airport runway
    September 30, 2013
    A new high quality runway surface has been laid at Bremen City Airport. This has provided a much-needed replacement at the airport as the old runway was laid over 20 years ago and was suffering from cracking and potholes. Laying the new surface required the airport to be closed, with the work having to be carried out in a tight time schedule. Contractor Heitkamp Erd- und Straßenbau was brought in to carry out the work as the firm had experience in runway rehabilitation projects having carried out pavemen
  • Versatile recycling option
    February 28, 2012
    A pavement recycling contractor in eastern New York State in the US is using an innovative and versatile Wirtgen machine to carry out very different road rehabilitation tasks. This unit is being used to lay foamed bitumen-recycling pavements as well as carrying out cold-milling.