Skip to main content

New tests aim for longer pavement life and reduced surface problems

Highways authorities around the world are testing every component of a pavement in a bid to improve durability. Kristina Smith looks at two very different examples, one from the UK and one from the US
October 24, 2019 Read time: 2 mins
AETEC’s wear simulator put 36 road marking products through their paces in a project which aims to prevent ‘ghost markings’

English national roads authority 8100 Highways England has moved onto the second stage of a £685,000 research project which aims to find hard-wearing road markings and materials that can remove those markings.

The authority believes that the findings of its research could help improve road safety and decrease whole-life pavement costs around the world.

Paid for out of a £1.5 million innovation fund, the project is part of a four-year research program which aims to drive improvements across England’s motorway and A-road network. Application and removal of road markings was identified as one of the most important areas for research.

Often, the shape of old markings can still be seen on a road even after they have been removed. These ‘ghost markings’ can be confusing for drivers and cause problems for autonomous and semi-autonomous vehicles. Water-blasting or shot-blasting removal techniques for markings cause damage to the surface of the road, leading to cracks and potholes which reduce the lifetime of the pavement.

Ghost markings.JPG
Remaining on roads, 'ghost markings' can confuse drivers and autonomous vehicles

The first phase of the Highways England research saw 36 road marking products from around the world tested at Spain’s AETEC facility in Madrid. “The Spanish facility, as well as being highly respected in the industry and in this field, was able to recreate our road surface,” said Martin Bolt, corporate group leader at Highways England who has been overseeing the research. “Elsewhere the tyres would have been tested on a smooth surface.”

The road marking products, which included thermoplastic, water-based paint, cold plastic and tapes, were tested for skid resistance, dry retroreflectivity, wet retroreflectivity and contrast. A series of images were taken during each testing cycle, including microscopic views.

After 12 months, the products will be removed using five different products. Contractor Kier and specialist road marking supplier Roadcare are working on the research project with Highways England.

For more information on companies in this article

Related Content

  • French fine milling achieved
    January 10, 2025
    Contractor 2AGE-MCS achieved precision and speed in milling the Route Centre-Europe Atlantique in France with the use of 3D technology
  • Sustainable Construction with Topcon
    February 7, 2024
    Michael Gomes, vice president of sustainability and corporate social responsibility at Topcon, talks to Mike Woof, editor of World Highways magazine, about the use of technology to deliver sustainability in road construction.
  • Bomag is on track – London to Glasgow in 2 hours and 40 minutes
    July 1, 2022
    British Railways has big plans. Trains on the first 220 km from London Euston Station to Birmingham could be travelling at a speed of 360 km/h (225 mph) in as little as 10 years. The earthworks required for this are to be completed by as early as 2025. The project is considered one of the largest and most ambitious infrastructure projects in recent British history. It must meet the highest possible construction quality standards and evolve over the course of the project - setting new standards today and for tomorrow. The deployment of innovative BOMAG technologies and machines is therefore logical and consistent.
  • Sophisticated paving technology
    March 22, 2021
    Trimble is introducing its sophisticated Roadworks 3D Paving Control Platform for Asphalt Pavers.