Skip to main content

New tests aim for longer pavement life and reduced surface problems

Highways authorities around the world are testing every component of a pavement in a bid to improve durability. Kristina Smith looks at two very different examples, one from the UK and one from the US
October 24, 2019 Read time: 2 mins
AETEC’s wear simulator put 36 road marking products through their paces in a project which aims to prevent ‘ghost markings’

English national roads authority 8100 Highways England has moved onto the second stage of a £685,000 research project which aims to find hard-wearing road markings and materials that can remove those markings.

The authority believes that the findings of its research could help improve road safety and decrease whole-life pavement costs around the world.

Paid for out of a £1.5 million innovation fund, the project is part of a four-year research program which aims to drive improvements across England’s motorway and A-road network. Application and removal of road markings was identified as one of the most important areas for research.

Often, the shape of old markings can still be seen on a road even after they have been removed. These ‘ghost markings’ can be confusing for drivers and cause problems for autonomous and semi-autonomous vehicles. Water-blasting or shot-blasting removal techniques for markings cause damage to the surface of the road, leading to cracks and potholes which reduce the lifetime of the pavement.

Ghost markings.JPG
Remaining on roads, 'ghost markings' can confuse drivers and autonomous vehicles

The first phase of the Highways England research saw 36 road marking products from around the world tested at Spain’s AETEC facility in Madrid. “The Spanish facility, as well as being highly respected in the industry and in this field, was able to recreate our road surface,” said Martin Bolt, corporate group leader at Highways England who has been overseeing the research. “Elsewhere the tyres would have been tested on a smooth surface.”

The road marking products, which included thermoplastic, water-based paint, cold plastic and tapes, were tested for skid resistance, dry retroreflectivity, wet retroreflectivity and contrast. A series of images were taken during each testing cycle, including microscopic views.

After 12 months, the products will be removed using five different products. Contractor Kier and specialist road marking supplier Roadcare are working on the research project with Highways England.

For more information on companies in this article

Related Content

  • Nuphalt is well-prepared to meet the growing challenge for road repairs
    November 21, 2023

    2023 is proving to be a great year for the Nuphalt Group. Beginning in January with a move into their brand-new, purpose-built facility in Rugby, UK, utilising new mezzanine floors (increased manufacturing space by 50%), adding state-of-the-art laser cutting equipment and, of course, bringing everything under one roof. And with 100 kW of PV solar power up there, that’s no ordinary roof! The move to a more self-sufficient premises is all part of Nuphalt’s vision for a greener future.

  • The new CBA asphalt granulator bucket
    October 1, 2021
    Available in two models: CBA 30 for 18 to 28-ton excavators, and CBA 40 for the 25 to 40-ton range
  • Graphene-enhanced pavements join UK Live Labs programme
    September 1, 2020
    While some parts of the world are on pause, road construction and new technology trials are still underway, as these stories demonstrate - Kristina Smith reports
  • Pūhoi-to-Warkworth motorway project
    September 25, 2020
    After a hiatus because of the COVID-19 lockdown, work has restarted on what will be one of New Zealand’s most visually impressive motorways. Andrew Thackwray, senior manager for project delivery for Waka Kotahi, the New Zealand Transport Agency, explains