Skip to main content

Innovative, quality asphalt surfacing solutions

An array of innovative mix designs and special processes have been introduced to the paving market in recent years. These are now being used in many site applications and are offering contractors the benefits of fast application and high surface quality while providing safe, cost-effective and hard wearing solutions with long life for clients.
February 22, 2012 Read time: 4 mins
Using the Bolidt technology can provide a durable and safe surfacing solution
An array of innovative mix designs and special processes have been introduced to the paving market in recent years. These are now being used in many site applications and are offering contractors the benefits of fast application and high surface quality while providing safe, cost-effective and hard wearing solutions with long life for clients.

Skid resistance is crucial to ensure safety and tests by the highway authorities in the Netherlands show that a new wearing course from 2291 Bolidt can help increase traffic safety. In the Netherlands, the independent specialist KOACoNPC is carrying out extensive trials for the Dutch Ministry of Transport into the skid-resistance properties of new and older road surfaces. The tests have shown that Bolidt's Boligrip wearing courses comply with strict European requirements on skid resistance.

The trials have been carried out at several sites where Boligrip wearing courses have been used such as the Hollandse Bridge, the Moerdijk Bridge, the Bridge at Hagestein and the Caland Bridge. As accident risks double or triple in the wet, the tests were carried out using a wet road surface. The RAW test 150 used features a PIARC measurement tyre without a profile at a speed of 50km/h and with 0.5mm of water on the road surface where there was 86% braking. The safety factor for vehicle traffic is at least 0.38 for existing road surfaces while for new road surfaces with a top layer containing stone chippings, the average skid resistance between the ruts must be at least 0.52 and in the ruts at least 0.45. Following the tests KOACoNPC was able to confirm that the measured skid resistance of those road surfaces with the Boligrip product met the requirement easily.

The Boligrip product is said to provide a seamless and comparatively maintenance-free wearing course material. This can be applied quickly due to a novel wearing course machine developed by Bolidt that can lay up to 10,000m2 of material/day. According to the firm, Bolidt provides an effective alternative to asphalt, which is shrinkage-free and can cope with varying loads and weather conditions. The wearing course machine is coupled to a distribution unit and this combination allows the material application task to be carried out automatically.
Meanwhile in the UK, a special mix design has been used to improve roadway performance during a refurbishment scheme contract on the M32 motorway. Contractor 3016 Cemex has used the latest generation of base and binder course material EME2 (Enrobe a Module Eleve), and met strict time constraints on a contract for Bristol City Council in Avon. The 700m resurfacing stretch had to be completed across both carriageways in just five days before the official opening of the city's €616.7 million Cabot Circus shopping centre. The contract was carried out under a lane rental contract, with the section of the motorway being closed on five consecutive nights for eight hours to allow for the removal and replacement of the worn road surface.

Each night up to 1,000tonnes of material was removed and sent for recycling. The motorway surface was then resurfaced with around 2,000tonnes of EME2 and topped with 1,000tonnes of Viatex, a high performance, thin surface asphalt developed by CEMEX that offers skid resistant properties, as well as reducing noise and spray. The EME2 material was first developed in France and is said to offer high strength and long life, featuring a high bitumen binder content combined with graded aggregate. The resulting material has a high resistance to fatigue and cracking, while being highly workable and relatively easy to lay. A novel feature of CEMEX's contract was the use of two paving machines working in echelon across both the northbound and the southbound carriages to provide a high quality surface across the motorway with no joins. This is the first contract that CEMEX Construction Services has carried out using EME2 and the firm has high hopes that combining it with CEMEX's Viatex will provide a finished road surface that is strong, durable, has a long life and is relatively quiet.

Also in the UK, high productivity has been achieved on a resurfacing project on the A229 at Blue Bell Hill in Kent in the UK. The contract was co-ordinated by 2393 Ringway on behalf of Kent Highway Services and needed just 56 hours to completely reconstruct 9,000m2 of the street and to resurface almost 38,000m2. The A229 required a durable material for the new construction, as it carries heavy traffic volumes. To meet the needs of the project, Ringway Technical Centre developed an innovative multilayer surfacing for the works, ensuring long lasting durability. After planning the existing carriageway Ringway applied five layers of surfacing: The 40mm asphalt layer consisted of a 14mm Fibrovia binder course, which was treated with Flexiplast before applying a 10mm layer of Ringway's patented Gripfibre. On top of these Ringway put another 40mm layer of Fibrovia binder Course and then applied the final surface of 14mm thick material. Ringway needed to fully close the road to minimise the impact on the network users and yet ensure local businesses near the site were disrupted as little as possible.

For more information on companies in this article

Related Content

  • Germany’s B-85 gets the treatment from Bomag’s BM 2200/75 planer
    February 23, 2018
    By this spring, Bomag’s new BM 2200/75 cold planer will have removed all the old pavement from a 2.6km section of Germany’s federal highway B-85. Work on the section between Amberg and Pittersberg started at the end of 2016 after the Ministry of Transport classified the road as being in “urgent need” of upgrading as part of the Federal Transport Infrastructure Plan. Actual roadworks began in mid-June 2017 after essential forestry work had been carried out, such as the removal of tree roots on both sides
  • Milling versatility on German road job
    March 22, 2017
    Milling efficiently with a versatile, mid-sized machine has offered benefits on a German road job. A German contractor has found that using a mid-sized milling machine from Wirtgen has offered a good combination of both versatility and productivity for a road rebuild job. Kassel-based milling specialist VORO has used a Wirtgen W 100 CFi to upgrade the surface of a section of the busy B3 route. The B3 is an important route and runs 755km from Buxtehude in the north of Germany through to the Swiss border in t
  • Compaction control boosts efficiency
    March 14, 2012
    Effective compaction control is one of a series of technical innovations boosting performance efficiency – Mike Woof writes. Maximising compaction efficiency can be a major cost factor on construction projects. Both for soil and asphalt compaction sectors, the risk from leaving an area under or over-compacted is substantial.
  • Brisbane’s Airport: Innovative Management of One of the World’s Busiest Runways
    June 26, 2014
    When it comes to runways, there are few busier then Brisbane’s main runway. Servicing both domestic and international travel, with over 200,000 movements per year, operating without a curfew Brisbane’s main runway is the busiest in Australia. For maintenance, crews only have a limited period of time to determine the pavement condition, normally during the night, making the detection of pavement faults difficult. To resolve this issue, a new high speed pavement scanner was used to rapidly survey the pavem