Skip to main content

Increasing demand for geosynthetics reinforcement

Geosynthetics have a wide variety of uses and these include providing extra strength in highway construction. Demand for geosynthetics in the United States alone is projected to increase 4.4% per year through to 2010 to more than 727 million m². Geosynthetics, used worldwide in the highway sector for strengthening, include geotextiles, geomembranes, geonets, geogrids, geosynthetic clay liners, preformed geocomposites, geocells and geofoams. The US advances will be fuelled by a recovery in nonbuilding constr
May 3, 2012 Read time: 4 mins
Germany's first permanent bridge abutment, constructed at Ilsenburg, using a GRS design and Fortrac geogrid

Geosynthetics have a wide variety of uses and these include providing extra strength in highway construction

Demand for geosynthetics in the United States alone is projected to increase 4.4% per year through to 2010 to more than 727 million m².

Geosynthetics, used worldwide in the highway sector for strengthening, include geotextiles, geomembranes, geonets, geogrids, geosynthetic clay liners, preformed geocomposites, geocells and geofoams. The US advances will be fuelled by a recovery in nonbuilding construction.

Additionally, geosynthetics will continue to increase their use in a wider range of applications, such as building construction and mining. Ongoing industry efforts to increase awareness among engineers and other specifiers of the benefits of geosynthetics in various markets will also support demand.

These and other trends are presented in Geosynthetics, a new study from The 2821 Freedonia Group, a Cleveland, US-based industry research company.

In 2005, geotextiles accounted for the largest share of demand (in area terms), with approximately three-quarters of the total. However, in value terms, geomembranes accounted for the largest share of the market, with about half of the total. Smaller volume geosynthetic products such as geogrids, geonets and geocomposites are expected to achieve strong growth through to 2010, benefiting from the ongoing development of new applications and new composite combinations.

Among the various markets for geosynthetics, the construction market was the largest in 2005 in terms of square metres, with onethird of the total. In addition, the total penetration of geosynthetics into building and some nonbuilding applications remains low, providing growth opportunities. In fact, the construction market will see the strongest gains through 2010 among the major geosynthetics markets.

"The road and other transportation construction market will also see above average gains, and the prospects for highway and street construction in the US will be buoyed by the implementation of projects financed by the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), which was passed in August 2005, and which secures funding for projects through to the 2010 fiscal year," says the report.

Liquid containment and mining and other markets will see growth below the industry average through to 2010.

(The report Geosynthetics, 248 pages, is available for US$4,300 from The Freedonia Group, 767 Beta Drive, Cleveland, OH 4 4 1 43-2326. Further details con tact www.freedoniagroup. com).

Geosynthetics can, among other uses, be used for soil reinforcement, filtration and, separation; improving load-bearing capacities, erosion control,retaining walls and bridge abutments, asphalt reinforcement and deep foundations.

German bridge

Germany's first bridge abutment built with geosynthetic reinforced soil (GRS) used Fortrac geogrid from 235 Huesker. Previously, during the design stage, the traditional approach for a bridge support was to consider a concrete abutment wall or a cast in situ bored piled foundation.

At Ilsenburg, Germany, GRS was used during bridge construction, where the tender issued by the Wernigerode local authority for the construction of a replacement bridge over the River Ilse as part of the upgrading of a district road, envisaged the bridge being supported on bored piles. The abutment was designed as an anchored gabion structure incorporating the piled elements.

However, a proposal from consulting engineers IBH-Herold & Partner Ingenieure, Weimar, acting for contractor 4902 Matthäi, Magdeburg, was to construct the abutment as a GRS structure. This would dispense with bored piles, making it Germany's first permanent bridge abutment to be constructed using GRS.

In place of load transfer through the piles, the proposal involved load transfer onto the GRS structure, onto which the abutment bearing shelf is directly cast. This structure comprises layers of fill, placed and compacted onto Fortrac geogrid.

The front face is constructed from galvanised steel gabion baskets filled with crushed stone, and the geogrid is double-looped around the steel facing and turned back. The reinforcement material, Fortrac geogrid type R140/30-30MP made from polyvinylalcohol (PVA), is said to be cost-effective, have excellent structural engineering properties and fulfils two important requirements.

"PVA geogrid has excellent long-term durability with a working life of 120 years, even when placed in a high pH fill (in this instance pH 10-11), and the geogrid has an extension under working load of much less than 6% and so is particularly suited to this situation, where only a very lowdeformation can be tolerated," says Huesker.

"The GRS construction method offers several advantages enabling the work to progress rapidly and above all with cost benefits." Compared with the client's original scheme, the GRS solution offered around a 30% saving, and was half the price of a conventional reinforced concrete substructure. Construction time was reduced by 25% on the client's scheme and 70% compared with the reinforced concrete version says the company.

For more information on companies in this article

Related Content

  • Two bridges in Nepal to help power generation increase
    October 11, 2012
    Construction of two vital bridges in Nepal will help increase power generation and offer a return on investment Two bridges are required in Nepal to enable the country to address its current capacity shortfall in electric power generation. Once constructed, they will be the largest single-span truss bridges in Nepal. Construction of the Arun River Bridge at Leguwaghat, Dhankuta, and Sabha Khola Bridge, Sankhuwasabha District, is also required to maximise the rate of return on special programmes under the R
  • Demand diversity in the construction equipment sector
    June 1, 2015
    Demand within the global construction equipment manufacturing industry is anything but homogenous, with certain countries and sales regions significantly outperforming others, with a whole host of factors fuelling and suppressing each key market - Guy Woodford reports
  • Winning formula for formwork
    July 19, 2012
    An unusual application of formwork took place recently in France, while formwork using one particular engineering construction kit was used for the first time in Poland. Guy Woodford reports An 80m long wild game underpass is an innovative feature of the Route Nationale 88 (RN 88) expansion in south-west France. For construction of the arched underpass tunnel, a PERI tunnel formwork carriage using VARIOKIT engineering construction kit was used. Thanks to the equipment’s easy handling, along with pre-assembl
  • Steel for Loch Ba bridge
    February 6, 2012
    Allerton Steel, on behalf of R J McLeod, has fabricated the steelwork for a replacement bridge at Loch Ba on Rannoch Moor in the Highlands as part of its A82 upgrade scheme for Transport Scotland. R J McLeod is the civil contractor on the £2.2 million (E2.6 million) scheme which replaces the existing three-span reinforced concrete bridge.