Skip to main content

Helsinki Airport is benefiting from a new runway surface

Finland’s main international airport, serving the capital Helsinki, is now benefiting from a runway resurfacing project. The rehabilitation work has been needed for one of the airport’s three runways due to a number of age-related defects. Helsinki Airport processes some 17 million passengers/year and due to a combination of the often severe winter weather and the heavy aircraft traffic, the runway condition was not of the standard required. Resurfacing work was scheduled by FINAVIA, with a budget of some
February 23, 2018 Read time: 2 mins
Finnish contractor Lemminkäinen used three W 220 large Wirtgen milling machines for the job
Finland’s main international airport, serving the capital Helsinki, is now benefiting from a runway resurfacing project. The rehabilitation work has been needed for one of the airport’s three runways due to a number of age-related defects. Helsinki Airport processes some 17 million passengers/year and due to a combination of the often severe winter weather and the heavy aircraft traffic, the runway condition was not of the standard required.

Resurfacing work was scheduled by 6704 FINAVIA, with a budget of some €11 million, while the total area to be rehabilitated 121,000m². The runway rebuild work was planned in stages, so as to mill off 250mm of asphalt from the runway surface, but with this work being handled in three passes. This method was required in order to separate the reclaimed material into different grades. The first stage of the planning job was to remove a 100mm layer, with a second stage milling away a 50mm asphalt layer, followed by the third phase to remove the final 100mm thickness.

The work was carried out by the Finnish contractor 3064 Lemminkäinen, which has a fleet of 2395 Wirtgen milling machines. The firm used three W 220 large milling machines for the job, allowing it to remove the layers within the tight timeframe required.

For more information on companies in this article

Related Content

  • TREV-2 to start a new section of Estonia’s Tallinn-Tartu highway
    August 11, 2017
    Estonia’s Road Administration and infrastructure company. TREV-2 Grupp has signed a €51 million contract for construction of a new four-lane section of highway between Kose and Ardu. The work will shorten the length of the of the Tallinn-Tartu highway by around 5km. The construction is scheduled in August 2017 with completion in 2020. The new section will allow speeds of up to 120kph, according to the government.
  • Trimble’s milling technology wins at Misano World Circuit
    April 4, 2016
    As Europe’s motorcycle racing season gets underway this year, Trimble employees will be avidly following the competitions at one venue in particular – Italy’s Misano World Circuit Marco Simoncelli. A Trimble solution recently helped to efficiently reconstruct the racing surface at Misano, about 14km south-east of the Italian city of Rimini on the eastern Adriatic coast. Since 1991, the racetrack has hosted the World Superbike Championship and, since 2007, the San Marino and Rimini's Coast motorcycle Gran
  • Bolivia tunnel and highway project under construction
    February 9, 2017
    In Bolivia work is progressing on the strategic Incahuasi tunnel project – Mauro Nogarin writes In southern Bolivia, the Bolivian Highway Administrator (ABC) is supervising the construction of the Incahuasi Tunnel and Monteagudo-Muyupampa-Ipati road. This work is of fundamental importance for the country as it will improve the flow of traffic and boost trade between the departments of Santa Cruz and Chuquisaca. The Monteagudo-Ipati highway project includes the Incachuasi tunnel which has a length of 96km
  • Bolivia’s latest highway project is underway
    May 29, 2018
    Bolivia’s new highway project will improve connections with Brazil and Chile – Mauro Nogarin reports. Work is underway on Bolivia’s new Rurrenabaque – Riberalta highway project, which will boost connectivity for the country. The project is being coordinated by the Bolivian Highway Administration (ABC), with an Eximbank loan of US$579.4 million providing the financing for 85% of the work. The remaining 15% of the funding will come from the Beni Department’s budget, where the route is being built. Located in