Skip to main content

Digital construction for asphalt paving

BOMAP is an innovative tool from BOMAG for digital construction
May 1, 2020 Read time: 2 mins

BOMAG is offering an innovative digital tool for road construction in the shape of its new BOMAP tool. According to BOMAG, its new BOMAP tool is the solution for the digital earthworks and asphalt construction site. This system can be used to document work results on site in real time. The app can be installed on standard Android tablets and smartphones. Its use is said to be intuitive and the tool documents the passes for all makes of rollers, while the optional aerial provides even more precise GPS location. The tool can be fitted to any type of roller quickly and is immediately ready for use. For BOMAG rollers, the app can record additional readings and thus create documentation for continuous compaction control (CCC).

The sophisticated BOMAP system features a colour coded screen in the roller cab
The sophisticated BOMAP system features a colour coded screen in the roller cab

BOMAP can be downloaded free of charge from the Google Play Store and installed on any Android device. In contrast to earlier systems for continuous compaction control (CCC), BOMAP is said to be highly intuitive to operate, which eliminates the need for additional training.

BOMAP documents passes via GPS – for every roller, regardless of make. The result can be exported as a PDF and show the customer the compaction performance achieved on the construction site in a transparent and comprehensible way. This ease of use is said to be a real plus for working efficiency, minimising the risk of both over- and under-compaction.

The daily results are automatically documented and BOMAP features an easy-to-read colour scale. The different colour areas signal the degree of compaction, which optimises time management on the construction site.

For an even more precise compaction map, BOMAG also offers an optional GPS aerial with a magnetic holder, which is connected to the Android device by Bluetooth.

Using the BOMAP system
Using the BOMAP system allows for more efficient working and better communications between personnel onsite

The BOMAG interface for measuring technology is called the BOMAG JOBLINK system. This package enables BOMAP to be connected directly to the BOMAG roller, and record other readings required for comprehensive and future-proof documentation such as EVIB, temperature, frequency and amplitude as well as useful status information on the machine.

Via the BOMAP cloud platform the machines in use can network with each other. This enables numerous additional functions and analyses that can be called up and implemented anywhere via BOMAP. Construction projects can also be planned and archived directly in the cloud.


Sponsored content produced in association with Bomag

For more information on companies in this article

Related Content

  • Sophisticated resurfacing work
    January 7, 2022
    Sophisticated technology has been used to help resurface a racetrack in Italy
  • Efficient road maintenance with Simex
    October 1, 2022

    Simex at Bauma Munich from 24 to 30 October, Hall C5, Booth 325.

    Bauma Munich – the most anticipated trade fair event in terms of strategic importance, turnout, new product launches and media impact for the earthmoving sector – has always been an opportunity for Simex to show to its partners and users its technical quality. The ability to innovate and do research, combining the new models in the range with new technological concepts, it’s the Simex way to outline the paths to be followed in the future.

  • Chile’s new urban highway link
    May 2, 2022
    Nestling in a valley beside the Andes mountain range, Santiago has a growing population and has suffered from increasingly heavy congestion in recent years, requiring a new urban road link for which safety has been set as a priority for drivers - *iRAP reports
  • The Path to Climate-Neutral Road Construction
    October 1, 2023
    Machine manufacturers and construction companies around the globe are currently searching for ways to achieve the goal of climate-neutral construction. The challenge here is to successively reduce emissions of CO2 and other harmful gases (summarized to CO2 equivalents: CO2e) around the world to zero over the coming decades. In the road construction sector, this transformation is inextricably linked to the improvement and further development of production and working processes. In the future, machines and construction materials will also be assessed based on the climate-harmful emissions arising from their production and use. However, the focus should not be on individual machines, but on the entire process leading up to the finished product – a road. Ultimately, the decisive factor is the emissions generated per kilometer of newly built or rehabilitated road – the “CO2e per work done”.