Skip to main content

Compact paving solution from Ammann

Ammann’s compact paver has proven its worth for a German contractor
February 3, 2021 Read time: 2 mins
An Ammann paver has been used to handle reinstatement work in Germany

As a road and civil engineering contractor, Karsten Stirnberg frequently repaves footpaths and bicycle trails in the Sauerland region of Germany. Until recently, the firm was not convinced on the benefits of using a machine for paving at narrow widths.

After the company’s latest rehabilitation project, owner Karsten Stirnberg changed his mind, based on the performance of the Ammann AFW 150-2 Mini Paver.

The paver was put to the test on a utility job in Menden, replacing the surface after pipeline repair work.

The dilapidated pipeline, located under pavement that was only 800mm wide, was wedged between the curb and front gardens, and ran through a residential street in Menden.

“We have always paved such narrow strips by hand,” Stirnberg said. He believed initially that using a paver would not be advisable given the small paving width, thinking this would be too expensive and too complex.

But Stirnberg decided to try the machine, testing one supplied by local dealer Kreitz & Ostermann in the neighbouring town of Iserlohn. The dealer also provided onsite instruction and helped train Stirnberg’s personnel to operate the paver, as well as providing support.

“The compact dimensions and unique performance data raised my interest in the machine,” said Stirnberg. The AFW 150-2 from Ammann is one of the most compact pavers around. It is only 2.9m long, 1.64m high and not even 880mm wide. The machine was easily able to handle the pave width of just 800mm required for the project, without any additional equipment. This model can even pave widths of just 250mm with only minor adjustments.

The Ammann compact paver delivered a quality finish for the utility repair work
The Ammann compact paver delivered a quality finish for the utility repair work

The AFW 150-2 twice travelled down the 300m-long by 800mm-wide footpath. During the first pass, the machine placed a 60mm-thick base course. Next came a 40mm surface pass. The compact paver is capable of handling thicknesses up to 100mm without difficulty.

Paving by hand would have taken at least eight hours and required more personnel according to Stirnberg, while the quality of finish was also high.

Because of the productivity and efficiency of the machine, Stirnberg opted to buy the unit rather than return the test machine to the dealer, Kreitz & Ostermann. 

For more information on companies in this article

Related Content

  • Novel concrete paving method used in Germany
    January 25, 2017
    A novel dual-layer concrete paving technique has been used on jobsites in Germany on the country’s high-speed Autobahn network This technique allows the construction of a strong and durable roadway structure able to cope with heavy traffic loads and offer a long working life. In four German states, Wirtgen SP-1500 slipformers have been employed by four different contractors to carry out dual-layer paving. The method allows a noise-reducing, non-skid exposed aggregate surface to be placed over a bottom
  • Ammann adds more paving courses at its Czech training campus
    April 13, 2015
    Swiss mechanical engineering company Ammann is increasing the frequency of its successful global paving campus training courses in the Czech Republic. These four-day-long expert knowledge sessions are run at the Ammann International Training Centre (AITC) in Nové Město nad Metují and, according to after sales projects manager and training centre boss Martin Sedláček, the idea is “to ensure that Ammann has a globally consistent (approach) to presenting, selling and servicing” the company’s fast-developing r
  • Machine control boosting paving quality
    April 27, 2015
    The use of machine control technology on a bypass construction job has boosted quality quality control is a topic that clients as well as contractors are finding increasingly important. Control systems are being used more and more often on construction sites as a result, so as to collect data on a range of processes. This includes looking at the asphalt being supplied to site and on the quality of paving during construction. Using this data, processes can be optimised in the medium-term and, in the long-ter
  • Peru’s Oyón -Ambo Highway presents challenges
    August 30, 2022
    Peru’s Oyón-Ambo highway project represents a landmark in construction for the country, while facing significant technical challenges – Paula Chapple, editor of Carreteras Pan-Americana (CPA), writes