Skip to main content

Compact paving solution from Ammann

Ammann’s compact paver has proven its worth for a German contractor
February 3, 2021 Read time: 2 mins
An Ammann paver has been used to handle reinstatement work in Germany

As a road and civil engineering contractor, Karsten Stirnberg frequently repaves footpaths and bicycle trails in the Sauerland region of Germany. Until recently, the firm was not convinced on the benefits of using a machine for paving at narrow widths.

After the company’s latest rehabilitation project, owner Karsten Stirnberg changed his mind, based on the performance of the Ammann AFW 150-2 Mini Paver.

The paver was put to the test on a utility job in Menden, replacing the surface after pipeline repair work.

The dilapidated pipeline, located under pavement that was only 800mm wide, was wedged between the curb and front gardens, and ran through a residential street in Menden.

“We have always paved such narrow strips by hand,” Stirnberg said. He believed initially that using a paver would not be advisable given the small paving width, thinking this would be too expensive and too complex.

But Stirnberg decided to try the machine, testing one supplied by local dealer Kreitz & Ostermann in the neighbouring town of Iserlohn. The dealer also provided onsite instruction and helped train Stirnberg’s personnel to operate the paver, as well as providing support.

“The compact dimensions and unique performance data raised my interest in the machine,” said Stirnberg. The AFW 150-2 from Ammann is one of the most compact pavers around. It is only 2.9m long, 1.64m high and not even 880mm wide. The machine was easily able to handle the pave width of just 800mm required for the project, without any additional equipment. This model can even pave widths of just 250mm with only minor adjustments.

The Ammann compact paver delivered a quality finish for the utility repair work
The Ammann compact paver delivered a quality finish for the utility repair work

The AFW 150-2 twice travelled down the 300m-long by 800mm-wide footpath. During the first pass, the machine placed a 60mm-thick base course. Next came a 40mm surface pass. The compact paver is capable of handling thicknesses up to 100mm without difficulty.

Paving by hand would have taken at least eight hours and required more personnel according to Stirnberg, while the quality of finish was also high.

Because of the productivity and efficiency of the machine, Stirnberg opted to buy the unit rather than return the test machine to the dealer, Kreitz & Ostermann. 

For more information on companies in this article

Related Content

  • Meeting the challenge of desert runway resurfacing
    April 13, 2012
    Ferocious daytime temperatures can provide a tough challenge to construction firms working in desert conditions in Egypt's south. Despite the high daytime temperatures however, Egyptian contractor Orascom has managed to complete an airport project on budget and ahead of schedule, while meeting the client's tight specifications. The firm has just completed the project to revamp Suhag Airport in the south of the country. This airport now features a new runway, taxiways and aircraft hard standing, as well as n
  • Successfully manage inventory when you have multiple crushers on site
    June 11, 2021
    Optimised maintenance is a key competitive advantage for an aggregate producer
  • Material feeder boosts paving job in South Africa
    December 14, 2017
    The use of a material feeder in a road paving job in South Africa has helped increase productivity and quality on the project. The contractor employed a Vögele MT 3000-2 Offset PowerFeeder to help optimise pavement quality, with the positive paving results having been confirmed by the University of Twente, Netherlands. This body monitored the project from a scientific perspective and its equipment included RoadScan, the innovative temperature-measurement system from Vögele. Using a material feeder can
  • Iowa expects longer lasting road surface
    June 9, 2015
    In the US state of Iowa, tough paving specifications are resulting in contractors delivering road surfaces that will last longer. The Iowa Department of Transportation (I-DOT) expects to see a highway road surface last 20 years and recently let the contract for a 25.7km road resurfacing project for Highway 92 between Winterset and Greenfield. The 40km link between the two towns sees an average 1,365 cars/day travel on the highway, which was last worked on in 1994 and its surface was due for replacement.