Skip to main content

Asphalt paving in island paradise

Praslin, the second-largest of the Seychelles Islands with roughly 6,500 inhabitants, is a tropical paradise of white sandy beaches, dense jungle and crystal clear seas. Tourism is the island's main source of income, and luxury tourism at that. A road had to be diverted for a new five-star hotel and property development project which will create jobs for around 400 people. The road would have obstructed the residents' access to the sea. Sey-Afrique Exporters from Pinetown, South Africa, won the contra
April 10, 2012 Read time: 2 mins
The Vögele paver is coping with tough conditions

Praslin, the second-largest of the Seychelles Islands with roughly 6,500 inhabitants, is a tropical paradise of white sandy beaches, dense jungle and crystal clear seas.

Tourism is the island's main source of income, and luxury tourism at that. A road had to be diverted for a new five-star hotel and property development project which will create jobs for around 400 people. The road would have obstructed the residents' access to the sea.

Sey-Afrique Exporters from Pinetown, South Africa, won the contract to build the new, approximately 1.5km stretch of road, and the company chose a 1194 Vögele paver for the construction work.

Temperatures of between 35-40°C with relative humidity of over 90% made this a physically gruelling job. The topography, with gradients of more than 20% and tight hairpin bends, was also tricky.

The small SUPER 800 which handles pave widths from 0.5-3.2m, was said to be ideal for the job. Its asymmetrical material hopper allows it to work close to the edges, even in tight bends.

To obtain asphalt on an island just 12km long and 5km wide, Sey-Afrique Exporters had to revive an old government-owned mobile asphalt mixing plant in order to prepare bitumen-coated material.

Although the mix did not meet the standard asphalt specifications, the SUPER 800 was able to produce good results with it. Combined with an AB 200 extending screed in TV version, the paver placed two asphalt layers on a roughly consolidated base. The first, a level-regulating layer between 3 and 12cm thick, was paved to equalise the considerable unevenness of the base. Then a 5cm wearing course followed.

Around 80tonnes of mix was paved every day for the roadway, which varied in width between 7.5m-10.5m.

Helmut Bethge from 2395 Wirtgen South Africa trained and supervised the paving team throughout the job.

For more information on companies in this article

Related Content

  • Asphalt paving review for 2019
    February 12, 2020
    A series of new asphalt pavers have been introduced in 2019
  • Vögele has developed a more advanced compact paver
    January 6, 2017
    Vögele says that its Super 800-3i asphalt paver is more sophisticated than previous machines in this size class. This new model replaces the firm’s earlier version and according to marketing manager Roland Schug said, “Now we have it with -3 technology.” With the screed retracted the machine is just 1.4m wide and with a low height of 2m it can be used in a parking area or underground parking lot. Schug said, “It’s part of our Vögele mini paver class and can be used to pave small roads, footpaths or cyclepa
  • Vögele has developed a more advanced compact paver
    April 22, 2015
    Vögele says that its Super 800-3i asphalt paver is more sophisticated than previous machines in this size class. This new model replaces the firm’s earlier version and according to marketing manager Roland Schug said, “Now we have it with -3 technology.” With the screed retracted the machine is just 1.4m wide and with a low height of 2m it can be used in a parking area or underground parking lot. Schug said, “It’s part of our Vögele mini paver class and can be used to pave small roads, footpaths or cyclepa
  • Hot-to-hot paving upgrades Bremen City Airport runway
    September 30, 2013
    A new high quality runway surface has been laid at Bremen City Airport. This has provided a much-needed replacement at the airport as the old runway was laid over 20 years ago and was suffering from cracking and potholes. Laying the new surface required the airport to be closed, with the work having to be carried out in a tight time schedule. Contractor Heitkamp Erd- und Straßenbau was brought in to carry out the work as the firm had experience in runway rehabilitation projects having carried out pavemen