Skip to main content

Asphalt paving in island paradise

Praslin, the second-largest of the Seychelles Islands with roughly 6,500 inhabitants, is a tropical paradise of white sandy beaches, dense jungle and crystal clear seas. Tourism is the island's main source of income, and luxury tourism at that. A road had to be diverted for a new five-star hotel and property development project which will create jobs for around 400 people. The road would have obstructed the residents' access to the sea. Sey-Afrique Exporters from Pinetown, South Africa, won the contra
April 10, 2012 Read time: 2 mins
The Vögele paver is coping with tough conditions

Praslin, the second-largest of the Seychelles Islands with roughly 6,500 inhabitants, is a tropical paradise of white sandy beaches, dense jungle and crystal clear seas.

Tourism is the island's main source of income, and luxury tourism at that. A road had to be diverted for a new five-star hotel and property development project which will create jobs for around 400 people. The road would have obstructed the residents' access to the sea.

Sey-Afrique Exporters from Pinetown, South Africa, won the contract to build the new, approximately 1.5km stretch of road, and the company chose a 1194 Vögele paver for the construction work.

Temperatures of between 35-40°C with relative humidity of over 90% made this a physically gruelling job. The topography, with gradients of more than 20% and tight hairpin bends, was also tricky.

The small SUPER 800 which handles pave widths from 0.5-3.2m, was said to be ideal for the job. Its asymmetrical material hopper allows it to work close to the edges, even in tight bends.

To obtain asphalt on an island just 12km long and 5km wide, Sey-Afrique Exporters had to revive an old government-owned mobile asphalt mixing plant in order to prepare bitumen-coated material.

Although the mix did not meet the standard asphalt specifications, the SUPER 800 was able to produce good results with it. Combined with an AB 200 extending screed in TV version, the paver placed two asphalt layers on a roughly consolidated base. The first, a level-regulating layer between 3 and 12cm thick, was paved to equalise the considerable unevenness of the base. Then a 5cm wearing course followed.

Around 80tonnes of mix was paved every day for the roadway, which varied in width between 7.5m-10.5m.

Helmut Bethge from 2395 Wirtgen South Africa trained and supervised the paving team throughout the job.

For more information on companies in this article

Related Content

  • Urban resurfacing on tracks with Caterpillar Paving
    July 9, 2024
    A UK contractor is making good use of its latest Caterpillar’s Cat Mobil-Trac paver for urban resurfacing works – Mike Woof reports
  • Vögele introduces improved medium-sized paver
    January 6, 2015
    Vögele is offering high performance paving with its new machine - Mike Woof writes Vögele is introducing a new medium class tracked paver, the SUPER 1600-3i and its rubber tyred sibling, the SUPER 1603-3i. The company is also offering an update to its SprayJet package for paving thin overlays. Both the SUPER 1600-3i and SUPER 1603-3i share the benefits of the firm’s Dash 3 features, with the tracked machine able to handle paving widths up to 7.5m and the rubber tyred version offer a maximum width of 7m.
  • Chinese market pavers offered by Vögele
    November 21, 2018
    Paver specialist Vögele is widening its product range of pavers for the Chinese market. The company is now offering the Super 1600L and Super 1600-3L variants in China, in addition to models such as the existing Super 1880L. As with the Super 1880L, the two new models feature larger hoppers (denoted by the L suffix) than standard pavers for Europe and other markets. This 15tonne hopper capacity allows the pavers to match the bigger asphalt delivery trucks used by Chinese contractors. The Super 1600L forms
  • Peru’s Matarani – Punta de Bonbon Highway
    January 5, 2016
    A major new highway project in Peru will improve connectivity for the Arequipa region - Mauro Nogarin writes Peru’s Matarani-Bonbon road project is an important route and forms part of the Camana - Dv Quilca - Ilo - Tacna highway project. The road stretches through several provinces in the Arequipa region. The deadline for completing the work is 720 days after January 2015, and it is scheduled to be completed by December 2016. Progress has been good and as of July 2015, it was 80% completed. The main