Skip to main content

Tackling Florida’s highway congestion

Congestion is a major problem in certain areas of US state Florida. Large number of commuters and tourists means that central Florida’s Interstate 4 (I-4) highway suffers particularly from congestion. Its proximity to Disneyland means that the traffic often comes to a complete standstill. A 2012 report from the Texas Transportation Institute ranked Orlando 13th in the US for traffic congestion, with more than 1.5 million daily trips on I-4. The report estimates that each frustrated commuter wastes about 45
August 5, 2016 Read time: 4 mins
The Volvo SD115 soil compactor is carrying out important duties on the project

Congestion is a major problem in certain areas of US state Florida. A large number of commuters and tourists means that central Florida’s Interstate 4 (I-4) highway suffers particularly from congestion. Its proximity to Disneyland means that the traffic often comes to a complete standstill.

A 2012 report from the Texas Transportation Institute ranked Orlando 13th in the US for traffic congestion, with more than 1.5 million daily trips on I-4. The report estimates that each frustrated commuter wastes about 45 hours/year sitting in traffic.

With Central Florida attracting 59 million visitors/year, it is clear that I-4 is in need of a major update. But an analysis showed that the project would take 27 years to complete with Florida Department of Transportation (FDOT) funding alone.

As a result, a novel PPP arrangement is being used that will allow the project to be completed in less than seven years.

This allows the FDOT to share financial risk with a team of private companies, which finance a portion of the project.

Three major infrastructure firms, 2296 Skanska USA Civil Southeast, 1007 Granite Construction and Lane Construction, have joined forces to tackle the project. Acting as the joint venture SGL Constructors, the firms collaborating on a $2.3 billion redesign and rebuild called the ‘I-4 Ultimate’.

Close to 2,000 workers will be involved during the project. The difficult terrain means that the plans involve the construction of no less than 140 bridges. There are 13 bridges being widened, while more than 74 are being replaced and a further and 53 new bridges are being built along the 34km route of the highway.

Project innovations include the use of recycled materials, such as existing concrete and limestone. The work also includes the use of carefully designed landscapes, lighting and bridges, to optimise the aesthetics.

Because the project is being carried out in the urban environment as well as alongside live traffic in some areas, safety is a key issue and the project team has placed this as a priority for the site personnel.

SGL’s safety policies include granting every person on site the authority to stop work if he or she notices a potential safety problem. This encourages each member of the project team to look out for everyone else.

Much of the equipment being used for the work has been supplied by 359 Volvo CE, via the Orlando branch of dealer Flagler Construction Equipment. SGL ordered more than 60 Volvo machines for the job. The fleet includes 31 single drum compactors – models SD45, SD75 and SD115 – and 32 hydraulic excavators that include the EC160E, EC350E and EC480E models, as well as the compact short swing excavator ECR88D and the short swing radius ECR235D.

The Volvo machines are being used for clearing and site preparation, pipe-laying and bridge demolition, using Volvo HB450 Plus and HB2400 Plus hammers.

The Volvo ECR305C is a short tailswing crawler excavator and its use is especially important on the I-4 project because much of the work is being carried out close to local homes and businesses, and many roads will be open to traffic during construction.

The project spans territory rich in waterways, fish, wildlife and sensitive environments. SGL says it is proactive in protecting natural resources, controlling spills and erosion at job sites. More than 93,000 native plants, trees, and shrubs will be planted in concert with native grasses to create a signature corridor in the region. SGL has also established a waste reduction goal to reuse and recycle 98% of all construction and demolition waste generated by the project.

To maximise site safety, operator training has also been placed as a priority. When SGL bought its Volvo CE excavators, the manufacturer also supplied a training simulator. As part of its hiring policy, SGL has been ensuring that all excavator operators brought in for the job have sessions on the simulator, to assess their abilities.

The simulator is also being used to help train up excavator operators, due to insufficient numbers of skilled and experienced personnel to work on this massive project.

For more information on companies in this article

Related Content

  • New demolition excavators
    April 29, 2025
    Extended reach excavators offers versatility for demolition works, with new models now available
  • New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk
  • Hydraulic attachments increases the versatility of utility machines
    August 21, 2015
    Utility machines are designed to be highly versatile and able to handle a wide range of duties but using attachments can further broaden the array of capabilities - Mike Woof writes The utility equipment market is a diverse sector of the construction machinery business. These versatile machines can be used in a vast array of duties and are very popular in the rental equipment market. Skid steer loaders, compact tracked loaders, compact wheeled loaders, mini excavators, zero tailswing excavators, wheeled
  • Smart excavators coming to market
    March 23, 2021
    New excavators coming to market offer a combination of increased performance and smart technology