Skip to main content

Liebherr opens a new logistics facility in Germany

The Liebherr Group now has a new logistics centre located at Oberopfingen, Germany. This facility is supplying customers around the world with spare parts for the firm’s wheeled and crawler excavators, wheeled loaders and bulldozers, as well as some other machines. The new facility has been opened followinga policy of centralisation of parts supply. Work started to construct the facility in mid-2013.
June 26, 2015 Read time: 2 mins
Liebherr has a new logistics facility for its earthmoving machines
The 718 Liebherr Group now has a new logistics centre located at Oberopfingen, Germany. This facility is supplying customers around the world with spare parts for the firm’s wheeled and crawler excavators, wheeled loaders and bulldozers, as well as some other machines. The new facility has been opened followinga policy of centralisation of parts supply. Work started to construct the facility in mid-2013.

The new central warehouse has an area of 47,000m², with space for about 100,000 different spare parts for the Earthmoving Equipment division. Parts are taken into and out of stock in the automatic warehouse areas, which can be up to 36m high. The firm says that its modern warehouse technology and order picking systems make it possible to ship 1,600 individual orders to many European countries, almost all of which on the day the order is received.

The location at Oberopfingen was chosen as it is next to the A7 Autobahn and is close to the major production site for Liebherr earthmoving machines at Kirchdorf an der Iller.

For more information on companies in this article

Related Content

  • Caterpillar has a Vision that includes total project site overview
    April 5, 2016
    Caterpillar may be on its financial back foot, but a recent event showed the company has a vision far beyond this or the next financial year – David Arminas reports. Many construction machinery manufacturers have some data collection and analysis systems for their heavy equipment. For a good decade, manufacturers have been moving in this direction, first as retrofit packages on machines in the field and increasingly as standard on newer models. Caterpillar is no exception among manufacturers that are movin
  • Asphalt advances and industry innovations in paving
    May 20, 2014
    Asphalt paving technology continues to develop, benefiting from new technologies and new diesel engines - Mike Woof reports The asphalt paving equipment market is seeing the introduction of new low emission engines that will meet the Tier 4 Final regulations for Europe and North America. These have required some major engineering changes, with firms now having to install bulky exhaust after-treatment systems and additional cooling for engines and turbos.
  • Using aspahlt testing equipment improves efficiency
    May 28, 2013
    From density tests on a Mongolian gold mine project to an all-singing, all-dancing asphalt tester, Kristina Smith reports on some of the latest new products in materials testing. Perhaps understandably, nuclear density gauges can present contractors with some order to move them at all. “One of the problems with nuclear soil gauges is the restrictions on movement,” said John Lamond, Manufacturing. “If you are a contractor projects cross-border, it’s a real challenge to move a nuclear density gauge around.”
  • bargain hunting, live onsite auction day in Donington, UK
    November 14, 2016
    It’s live onsite auction day in Donington, UK and it’s noisy. It’s also raining in early morning but that doesn’t put off the gathering crowd Buyers are milling around parked machinery. They kick tyres and slam doors. Some are behind the wheel, gingerly nudging vehicles frontwards and backwards or raising and lowering booms. Their partners stand a few metres away scrutinising the machine’s movements.