Skip to main content

Liebherr opens a new logistics facility in Germany

The Liebherr Group now has a new logistics centre located at Oberopfingen, Germany. This facility is supplying customers around the world with spare parts for the firm’s wheeled and crawler excavators, wheeled loaders and bulldozers, as well as some other machines. The new facility has been opened followinga policy of centralisation of parts supply. Work started to construct the facility in mid-2013.
June 26, 2015 Read time: 2 mins
Liebherr has a new logistics facility for its earthmoving machines
The 718 Liebherr Group now has a new logistics centre located at Oberopfingen, Germany. This facility is supplying customers around the world with spare parts for the firm’s wheeled and crawler excavators, wheeled loaders and bulldozers, as well as some other machines. The new facility has been opened followinga policy of centralisation of parts supply. Work started to construct the facility in mid-2013.

The new central warehouse has an area of 47,000m², with space for about 100,000 different spare parts for the Earthmoving Equipment division. Parts are taken into and out of stock in the automatic warehouse areas, which can be up to 36m high. The firm says that its modern warehouse technology and order picking systems make it possible to ship 1,600 individual orders to many European countries, almost all of which on the day the order is received.

The location at Oberopfingen was chosen as it is next to the A7 Autobahn and is close to the major production site for Liebherr earthmoving machines at Kirchdorf an der Iller.

For more information on companies in this article

Related Content

  • Volvo CE’s arduous Andes assignment
    August 20, 2013
    Volvo Construction Equipment is working in some of the world’s most treacherous terrain to construct a high-speed road link across the Andes Mountains. A fleet of 60 Volvo Construction Equipment (Volvo CE) road-building machines is being used to construct a 140km highway across the Andes Mountains, from Bucaramanga, Colombia’s eighth largest city, to Cucuta on the border – providing the country with a much-needed high-speed link with Venezuela. Tasked with this huge undertaking is innovative Colombian highw
  • Volvo CE’s arduous Andes assignment
    August 20, 2013
    Volvo Construction Equipment is working in some of the world’s most treacherous terrain to construct a high-speed road link across the Andes Mountains. A fleet of 60 Volvo Construction Equipment (Volvo CE) road-building machines is being used to construct a 140km highway across the Andes Mountains, from Bucaramanga, Colombia’s eighth largest city, to Cucuta on the border – providing the country with a much-needed high-speed link with Venezuela. Tasked with this huge undertaking is innovative Colombian highw
  • Volvo CE’s arduous Andes assignment
    August 20, 2013
    Volvo Construction Equipment is working in some of the world’s most treacherous terrain to construct a high-speed road link across the Andes Mountains. A fleet of 60 Volvo Construction Equipment (Volvo CE) road-building machines is being used to construct a 140km highway across the Andes Mountains, from Bucaramanga, Colombia’s eighth largest city, to Cucuta on the border – providing the country with a much-needed high-speed link with Venezuela. Tasked with this huge undertaking is innovative Colombian hi
  • Brazil’s booming economy fuels infrastructure demand
    January 9, 2013
    The emergence of Brazil as a major economic force and its need to improve infrastructure is proving a magnet for investment. Patrick Smith reports. Brazil is now the sixth biggest economy in the world according to its Finance Minister Guido Mantega. The largest country in South America with a population of 190 million and one of the BRICS, (Brazil, Russia, India, China, South Africa, Brazil’s economy grew 2.7% in 2011 and is now worth $2.5 trillion, having overtaken the UK. With big oil and gas reserves sti