Skip to main content

Liebherr opens a new logistics facility in Germany

The Liebherr Group now has a new logistics centre located at Oberopfingen, Germany. This facility is supplying customers around the world with spare parts for the firm’s wheeled and crawler excavators, wheeled loaders and bulldozers, as well as some other machines. The new facility has been opened followinga policy of centralisation of parts supply. Work started to construct the facility in mid-2013.
June 26, 2015 Read time: 2 mins
Liebherr has a new logistics facility for its earthmoving machines
The 718 Liebherr Group now has a new logistics centre located at Oberopfingen, Germany. This facility is supplying customers around the world with spare parts for the firm’s wheeled and crawler excavators, wheeled loaders and bulldozers, as well as some other machines. The new facility has been opened followinga policy of centralisation of parts supply. Work started to construct the facility in mid-2013.

The new central warehouse has an area of 47,000m², with space for about 100,000 different spare parts for the Earthmoving Equipment division. Parts are taken into and out of stock in the automatic warehouse areas, which can be up to 36m high. The firm says that its modern warehouse technology and order picking systems make it possible to ship 1,600 individual orders to many European countries, almost all of which on the day the order is received.

The location at Oberopfingen was chosen as it is next to the A7 Autobahn and is close to the major production site for Liebherr earthmoving machines at Kirchdorf an der Iller.

For more information on companies in this article

Related Content

  • XCMG boosting capacity
    January 6, 2017
    Increased manufacturing capacity has been a key focus for XCMG in recent years, with the firm having committed to upgrading its production facilities. XCMG has invested heavily in new manufacturing capacity for its ranges of cranes and wheeled loaders and both the Heavy Machinery and Wheeled Loader divisions now have new factories. The heavy crane facility produces machines in the 90tonne category and above and all production moved to the new plant in 2012 as the old factory was too small. The new facility
  • XCMG boosting capacity
    November 26, 2012
    Increased manufacturing capacity has been a key focus for XCMG in recent years, with the firm having committed to upgrading its production facilities. XCMG has invested heavily in new manufacturing capacity for its ranges of cranes and wheeled loaders and both the Heavy Machinery and Wheeled Loader divisions now have new factories. The heavy crane facility produces machines in the 90tonne category and above and all production moved to the new plant in 2012 as the old factory was too small. The new facility
  • Zipping up road lanes
    September 28, 2018
    QMB has a Lindsay Road Zipper on duty near Montreal. World Highways deputy editor David Arminas climbed aboard As vice president of Canadian barrier specialist QMB, based in Laval, Quebec, Marc-Andre Seguin is sanguine about the future for moveable barriers. On the one hand, it looks good. The oft-stated advantage of moveable barriers is that the systems are cheaper to install than adding a lane or two to a highway or bridge. Directional changes to lanes can boost volume on a road without disrupting tra
  • Booming BICES 2015 to attract more visitors
    September 10, 2015
    The 13th Beijing International Construction Machinery Exhibition & Seminar (BICES) will be the largest exhibition for construction machinery in Asia during 2015. This major event is being held from September 22nd to 25th, 2015 at the New Beijing International Exhibition Centre (NBIEC) for the first time. This new venue is the most advanced exhibition center in Beijing and the event has switched to the site in response to demands from both exhibitors and visitors. The switch to the NBIEC marks another milest