Skip to main content

Nepal road upgrades being planned

A series of infrastructure upgrades are planned for Nepal that will help improve its economic development. A key infrastructure requirement for Nepal is the development of its road network. In a move to tackle the issue, Nepal’s Ministry of Physical Infrastructure and Transport has initiated the strategy for the development of roads in all 75 districts by 2022. About US$7.5 billion has been estimated as being required for the completion of this project. Funding will require financing from internal sources
November 28, 2016 Read time: 2 mins
A new bridge is being built connecting Tanahun and Chitwan for the Prithvi Highway , which lies upstream of the old Mungling Bridge over Trishuli River
RSSA series of infrastructure upgrades are planned for Nepal that will help improve its economic development. A key infrastructure requirement for Nepal is the development of its road network. In a move to tackle the issue, Nepal’s Ministry of Physical Infrastructure and Transport has initiated the strategy for the development of roads in all 75 districts by 2022.

About US$7.5 billion has been estimated as being required for the completion of this project. Funding will require financing from internal sources and substantial foreign investment. This exclusive report has been provided by World Highways correspondent in Nepal, Ram Krishna Wagle.

After the completion of the five year project, there will be five highways connecting India and China through Rani-Itahari-Dhankuta-Leguwaghat-khadibari-kimthanka way (310km) and Thori-Bhandara-Malekhu-Galxi-Trishuli-BetriBati-Sheyfubasi-Rasuwagadi way (188km) respectively.

Similarly, Belhiya-Bhairawa-Palpa-Ramdi-Kaligandaki-RudraBani-Maldhunga-Beni-Jomsom-Chaile-korla way (390km), Birgunj-Narayanghat-Kathmandu-Tatopani way (392km) and Kathmandu-Terai fast track (73km) has been designed so as to meet the strategy.

Under this project, the government planned Jamunaha-Nepalgunj-Baghesiyal-khulalu-semikot-lelsa road (521km) will be built. At present, Nepal has only one East-West Highway but the plans call for three highways connecting east to west according to a government official.

According to an official, Postal highway; Puspalal (mid hill), East-west highway and Dharan-Hetuada-Tulsipur-Surkhet highway will be constructed. Likewise other 17 roads (654km) are estimated to complete by 2020. Similarly, the Nadha-Koshi pool chatar rupnagar road (61km,  Biratnagar ringroad (42km), Leghughat-Bhojpur (65km), Mathanthal- Ramechapa road (13km), Halesi-dhiktal road (35km), Mechi pool-Chandragadi-Birtamod road (12km) will be completed with this project.

Similarly, the Kathmandu ring road (27km) and Bhaktapur-Suryabinayak-Dhulikhel road (17km) road will be upgraded to four lanes within two years and five years respectively.

Within four years Nepal’s Government has plans to construct a series of two lanes roads. These are; Karnti Lokmarga (92km), Dkashinkali-Chaimalay-Sesnari-Khulekhani road (45km) and Sitapaila-Dharkay (24km). Lamosaghu-Tamakoshi-Jiri road (55km), Sahid Marg road Gorahi-Ghartigau (42km), Pokhara ring road (82km), Safebagar-Martadi road (28km), Bardaghat-Paladada-Tribeni road (13km), Balaju-Ranipauwa-Kakani-Trishuli road (53km), Chaharay-Bidur road (17km), Balkhu-Dhashinkali road (12km), Bhaktapur-Nagarkot-Sipakot road (16km), Bharatpur-Rampur-Meghauli road (16km), Janakpur ring road (74km) and Silgadi-Safnebagar road (65km).

Related Content

  • Nepal’s Kathmandu-Terai Fast Track road to be built under annuity model?
    March 31, 2014
    India's Infrastructure Leasing & Financial Services (IL&FS) has offered to build the 76km, US$1.01 billion Kathmandu-Terai Fast Track road in Nepal under an annuity model, proposing that the government issue a global tender. This model is suitable as investors, including IL&FS and other Indian firms Reliance Infrastructure and Larsen & Toubro, have proved unwilling to undertake the project under a BOOT system. The Kathmandu-Terai Fast Track road will carry an estimated 3,000 vehicles a day.
  • New highway link for key Algerian port
    September 24, 2014
    Work on a new highway link is now underway in Algeria. The road will connect the port of Ghazaouet with the East-West highway, improving inter-modal transport. The new highway will boost truck movements to and from the port and help develop trade while also helping cut congestion in the town as existing links are not able to cope with the traffic volumes. The first 16km portion of the highway is being constructed by a Chinese contractor. Meanwhile construction of Algeria’s 58km coastal bypass connecting Gha
  • Loans for Georgian roads
    July 20, 2012
    Loans from the European Investment Bank (EIB) and the EU will finance highway work in Georgia. The funds will be used to pay for the construction of the high-speed motor road running from West – East across Georgia. The EIB will give a long-term preferential credit worth €170 million, while the EU will provide a €20 million grant. As part of the project, a four lane highway measuring 52km will be built from Samtrediya – Grigoleti, while the 16km section Grigoleti - Kobuleti stretch will be repaired.
  • Loans from Europe will fund highway works in the nation of Georgia
    May 15, 2012
    Loans from the European Investment Bank (EIB) and the EU will fiancé highway work in Georgia. The funds will be used to pay for the construction of the high-speed motor road running from West – East across Georgia. The EIB will give a long-term preferential credit worth €170 million, while the EU will provide a €20 million grant. As part of the project, a four lane highway measuring 52km will be built from Samtrediya – Grigoleti, while the 16km section Grigoleti - Kobuleti stretch will be repaired.