Skip to main content

Caterpillar closing two manufacturing plants

Caterpillar is closing its factories in Aurora Illinois and at Gosselies in Belgium, with the loss of around 3,000 jobs in all. The Aurora facility makes wheeled loaders, with production being switched over to facilities at Decatur, also in Illinois, as well as North Little Rock in Arkansas. This will result in the loss of 800 jobs at the Aurora plant although there will be more personnel required at the Decatur and North Little Rock facilities that will offset the losses Meanwhile the firm says that the
April 4, 2017 Read time: 2 mins
178 Caterpillar is closing its factories in Aurora Illinois and at Gosselies in Belgium, with the loss of around 3,000 jobs in all. The Aurora facility makes wheeled loaders, with production being switched over to facilities at Decatur, also in Illinois, as well as North Little Rock in Arkansas. This will result in the loss of 800 jobs at the Aurora plant although there will be more personnel required at the Decatur and North Little Rock facilities that will offset the losses

Meanwhile the firm says that the closure of the Gosselies site will impact on some 2,000 employees. The firm first announced that it was considering allocating production at the Belgian facility to other manufacturing plants in September 2016. However the company has now made the formal decision to close the facility, so production of its products on the site will be gradually phased out. All production is expected to cease by mid-year 2017. The other operations and functions on the Gosselies site are expected to be gradually ramped down until the end of 2017.

Caterpillar Belgium has agreed to sell the site to the Region of Wallonia. Ownership of the facility will switch to the firm Sogepa, which is an investment company of the Region. In order to support reconversion of the site, Caterpillar agreed to sell the site plus some of the installations and assets for a symbolic euro. The sale is to be effective on 30th June 2018.

For more information on companies in this article

Related Content

  • Revenue holds steady for Wacker Neuson in 2016
    March 16, 2017
    Wacker Neuson said that it managed to keep 2016 revenue stable despite challenging market conditions but profitability was impacted by crises in key markets. The company is positive about 2017 and expects revenue and earnings to grow again. Revenue for 2016 was €1.36 billion, up only 0.3% on 2015. Profit was negatively affected by crises in emerging markets and industries as well as a number of one-off effects, the company said. Profit before interest and tax (EBIT) contracted 15% to just over €88
  • Volvo CE president unveils emissions technology and product development programme
    January 6, 2017
    Volvo Construction Equipment president Pat Olney has unveiled the low-emissions technology used in the company’s forthcoming Stage IV/Tier 4 Final-compliant machines. He also detailed the progress of investments in Europe and other international markets and announced the extensive development pipeline that will see a radically updated product range launched over the next two years.
  • Volvo CE president unveils emissions technology and product development programme
    April 17, 2013
    Volvo Construction Equipment president Pat Olney has unveiled the low-emissions technology used in the company’s forthcoming Stage IV/Tier 4 Final-compliant machines. He also detailed the progress of investments in Europe and other international markets and announced the extensive development pipeline that will see a radically updated product range launched over the next two years.
  • Tampere road tunnel - a strategic link for central Finland
    April 4, 2016
    Progress has been good for an important underground road link in Finland reports Adrian Greeman. Assuming all goes well, the new Ranta, or Lakeside, tunnel in Tampere will open in full six months early; traffic could be running by the end of this year. Work on transforming the rundown city centre with new developments will get a major boost. It is a major achievement on a four-year-long project bringing significant benefits to one of Finland's largest cities. From the government's point of view the scheme w