Skip to main content

NUH Cement sticks with Hitachi

The cement factory with the highest output in Europe can be found some 130km east of Istanbul, Turkey, and belongs to NUH Cement. In 2007 the company's quarry in Hereke produced 4.3 million tonnes of limestone, and after on-site processing with additives such as gypsum, iron oxide and coal, this resulted in a yield of 5 million tonnes of Portland cement. Founded in 1966, the company's mission statement is to "serve Turkey's development programme with its production of cement, and huge investments in facilit
July 30, 2012 Read time: 2 mins
The cement factory with the highest output in Europe can be found some 130km east of Istanbul, Turkey, and belongs to NUH Cement.

In 2007 the company's quarry in Hereke produced 4.3 million tonnes of limestone, and after on-site processing with additives such as gypsum, iron oxide and coal, this resulted in a yield of 5 million tonnes of Portland cement.

Founded in 1966, the company's mission statement is to "serve Turkey's development programme with its production of cement, and huge investments in facilities, systems and processes are helping it to achieve this aim, and this, says NUH, includes its fleet of large excavators from 233 Hitachi Construction Machinery (Europe)/1139 HCME.

The company has bought an EX1800, EX1200 and most recently an EX1900 to extract and load raw materials in the quarry. The EX1900 was bought to increase production and ensure that 1,500tonnes of aggregates are delivered to the crusher every hour. NUH Cement is hoping to double production by 2011, which would require even more new machines in the next few years.

The company requires excavators that can cope with the demanding nature of the work and follows a stringent procurement process. HCME and Turkey's official Hitachi distributor 5252 Enka Pazarlama have succeeded in this process three times.

For more information on companies in this article

Related Content

  • Record breaking ABM bridge beams installed near Raith, Scotland
    September 30, 2016
    One of the largest mobile cranes in the UK, a 1,500tonne capacity unit, recently positioned nine 90tonne 42m pre-stressed bridge beams by ABM Precast Solutions. The massive W-beams were hoisted into place at Junction 5, the Raith Interchange, on Scotland’s M74 motorway – part of the M8-M73-M74 motorway improvements project.
  • Hitachi’s ZX55U-6EB is its first zero-emission 5-tonne battery-powered excavator for Europe
    October 24, 2022
    Hitachi Construction Machinery (Europe) (HCME) is meeting the growing need for emission-free equipment and a sustainable future with the launch of a new five-tonne battery-powered excavator, the ZX55U-6EB.
  • New crushing and screening developments abounded at Hillhead
    October 3, 2014
    A wide array of crushing, screening and materials handling technologies have been introduced in recent months - Mike Woof writes The manufacturers of crushing and screening products have been developing an array of new systems to optimise production. The recent Hillhead show in the UK was the launch point for a number of these new products, although firms from all over the world have also been developing new designs. Productivity and wear life are two performance factors seeing major benefits from innovatio
  • Trio of manufacturers release cutting-edge hybrid excavators
    May 19, 2014
    A trio of leading global construction equipment manufacturers have released innovative hybrid excavators. Guy Woodford reports on the new models Hitachi Construction Machinery (Europe) has launched the first of a new generation of excavators, the ZH210LC-5 hybrid. The latest innovative Zaxis-5 model has been designed to deliver reliable performance with fewer emissions and less fuel than the ZX210-3 model.