Skip to main content

NUH Cement sticks with Hitachi

The cement factory with the highest output in Europe can be found some 130km east of Istanbul, Turkey, and belongs to NUH Cement. In 2007 the company's quarry in Hereke produced 4.3 million tonnes of limestone, and after on-site processing with additives such as gypsum, iron oxide and coal, this resulted in a yield of 5 million tonnes of Portland cement. Founded in 1966, the company's mission statement is to "serve Turkey's development programme with its production of cement, and huge investments in facilit
July 30, 2012 Read time: 2 mins
The cement factory with the highest output in Europe can be found some 130km east of Istanbul, Turkey, and belongs to NUH Cement.

In 2007 the company's quarry in Hereke produced 4.3 million tonnes of limestone, and after on-site processing with additives such as gypsum, iron oxide and coal, this resulted in a yield of 5 million tonnes of Portland cement.

Founded in 1966, the company's mission statement is to "serve Turkey's development programme with its production of cement, and huge investments in facilities, systems and processes are helping it to achieve this aim, and this, says NUH, includes its fleet of large excavators from 233 Hitachi Construction Machinery (Europe)/1139 HCME.

The company has bought an EX1800, EX1200 and most recently an EX1900 to extract and load raw materials in the quarry. The EX1900 was bought to increase production and ensure that 1,500tonnes of aggregates are delivered to the crusher every hour. NUH Cement is hoping to double production by 2011, which would require even more new machines in the next few years.

The company requires excavators that can cope with the demanding nature of the work and follows a stringent procurement process. HCME and Turkey's official Hitachi distributor 5252 Enka Pazarlama have succeeded in this process three times.

For more information on companies in this article

Related Content

  • Cleaner quarrying
    June 10, 2019
    A project to reduce carbon emissions from quarrying operations is underway in Sweden.
  • Volvo wheeled at work in Qatar sand plant
    May 29, 2013
    Wheeled loaders are operating in the world’s largest sand cleaning plant. Located 50km from the capital Doha, Qatari Primary Materials (QPMC) operates one of the world’s largest sand cleaning plants. With temperatures reaching 40°C and 64,000tonnes of aggregates needed to be handled for every export shipment, Volvo Construction Equipment’s wheeled loaders are helping with operations in the gas-rich state. Volvo CE is involved in one of the country’s largest industrial operations, having provided QPMC with a
  • India’s longest tolled expressway is open to traffic
    January 2, 2013
    Earlier this year, a new expressway was opened to traffic in India, adding connectivity to the country’s road network - Mike Woof reports. India’s economic growth has fuelled a massive construction boom in the country. Road building has been set as a priority by the Indian Government to help ensure continued economic development and improve connectivity between major population centres. One major new expressway has recently opened to traffic, having been designed to international standards and provides insi
  • Hitachi rolling out new excavator range
    March 2, 2016
    Hitachi says that its new ZX250LC-6, ZX300LC-6 and ZX350LC-6 excavators all offer increased performance. At the same time, the machines also meet the latest Tier 4 Final/Stage IV exhaust emissions requirements for off highway equipment. Productivity has been increased by up to 14% while fuel consumption has been reduced. These machines are aimed at the classes for 25, 30 and 35tonne excavators respectively. The firm claims that the machines offer the highest outputs in their respective classes as well as ad