Skip to main content

Demonstrating the latest in construction machines

Sandvik Mining and Construction and Volvo Construction Equipment have jointly held a series of machinery demonstrations and customer events in Sweden.
February 28, 2012 Read time: 2 mins
Volvo CE and Sandvik Mining and Construction held a series of joint customer equipment demonstartions at Volvo CE's facility in Eskilstuna, Sweden
325 Sandvik Mining and Construction and 2394 Volvo Construction Equipment have jointly held a series of machinery demonstrations and customer events in Sweden.
The events were run at Volvo CE’s facility in Eskilstuna and were intended to demonstrate how Sandvik drilling, crushing and screening equipment can operate efficiently alongside 359 Volvo CE excavators, wheeled loaders, articulated haulers and road building equipment. In addition, Sandvik also launched new products including two new breakers. Called Rock to Road, the customer event showed how equipment from the two firms can provide a productive and efficient solution for quarrying and road building. The focus was on the needs of customers in the aggregates and road building segments.
The Sandvik equipment displayed was split into two distinct offerings: Rock to Road and Demolition to Road. The Sandvik equipment being shown for the quarry sector included a DC302 drill rig, DX780 drill rig, UJ440E tracked jaw crusher, UH640 tracked cone crusher, QA450 tracked triple deck screener, QE440 tracked scalping screener and BR4099 breaker. Sandvik machines on show for the demolition and road sectors included a BC2019 multiprocessor, BR2577 breaker, BR2155 breaker, BG2010 sort bucket and QI240 tracked impact crusher. Customers were able to see how Volvo excavators can work with Sandvik breakers or can be used to load Sandvik crushers, while raw and processed materials were hauled using Volvo ADTs.
While demonstrations of the latest machinery from the Sandvik and Volvo CE product ranges were the most visible portion of the event, the firms also placed a major emphasis on aftermarket developments. Customers were presented with opportunities to discuss their parts and service requirements at first hand.

For more information on companies in this article

Related Content

  • High quality Swedish stone
    February 10, 2012
    Close to Sweden's second largest city Göthenburg lies the efficient Jehander quarrying operation run by Heidelberg Cement. The site produces around 9,000tonnes/day at peak seasonal demand and has an output of some 1,000,000tonnes/year. The site has recently renewed its operating permission and now has the necessary approval to work until 2021.
  • Innovations in crushing and screening technology boosting efficiency
    July 15, 2015
    The crushing and screening sector has seen a flurry of new model launches in recent months, with a series of new equipment introductions - Mike Woof writes. Crushing and screening systems play a vital role in the overall cost effectiveness of a quarrying operation. Ensuring that a quarry runs efficiently relies heavily on the appropriateness of the entire crushing and screening set-up for the material input, the output grades and the compatibility of each separate unit. Mobility has been a key issue in rece
  • Sandvik’s Korean roots
    June 14, 2012
    Sandvik has supplied an aggregate plant to the DooWon Development Company to process granite at its Jungeub quarry in JeonRa province, South Korea. The supplied equipment is processing blasted rock from a feed size of -900mm in order to produce aggregate for the Korean construction industry, with the product fractions ranging from 0-5mm to 13-25mm, at a required rate of production of 500tonnes per hour.
  • Sandvik’s Korean roots
    June 13, 2012
    Sandvik has supplied an aggregate plant to the DooWon Development Company to process granite at its Jungeub quarry in JeonRa province, South Korea. The supplied equipment is processing blasted rock from a feed size of -900mm in order to produce aggregate for the Korean construction industry, with the product fractions ranging from 0-5mm to 13-25mm, at a required rate of production of 500tonnes per hour.