Skip to main content

Sandvik carries out drill and blast seminar in Russia

Boosting quarrying efficiency by improving drilling and blasting operations. Drilling and blasting operations are crucial for quarry efficiency and Sandvik recently held a Russian Quarry seminar focussing on this in a bid to boost effectiveness for a number of key clients. Sandvik Construction Russia worked with official distributor Quarry-Service to run the Quarry Seminar, this year located in Yekaterinburg. The event concentrated on drilling and blasting and featured the expertise and knowledge of Arne L
July 29, 2015 Read time: 3 mins
Sandvik ran a Quarry Academy earlier this year in Russia, focussing on drilling and blasting techniques
Boosting quarrying efficiency by improving drilling and blasting operations

Drilling and blasting operations are crucial for quarry efficiency and 325 Sandvik recently held a Russian Quarry seminar focussing on this in a bid to boost effectiveness for a number of key clients. Sandvik Construction Russia worked with official distributor Quarry-Service to run the Quarry Seminar, this year located in Yekaterinburg. The event concentrated on drilling and blasting  and featured the expertise and knowledge of Arne Lislerud, one of the ley figures within Sandvik’s Quarry Academy. The event was attended by eight representatives, each from six of the leading regional quarry companies.

During the latest Russian Quarry Seminar participants were able to discuss the cornerstones of blast hole drilling. This included safety issues, as well as examining the experiences of successful companies in Norway and Canada. Other topics included the reduction of fines and oversize rock levels in blasting.

The second day of the programme included a visit to the Nadezhdinskoye quarry in the Privolzhsky region. Quarry Seminar participants were able to see new blasting initiatives being implemented, and draw on these experiences to develop successful strategies for increasing the quality of final products. After seeing blasting and analysing the deposits, Lislerud discussed measures to improve blasting efficiency. These included how to achieve the best possible results with respect to the geological make-up of a quarry, and how a few relevant parameters could be changed in such areas as blast direction, hole diameter, drill plan and delay intervals.

Efficient blasting is vitally important for a quarrying operation as it has a direct influence on the profitability of an operation. Good blasting techniques deliver blasted material that fits within the size range required by the crushing and screening system on site, boosting throughput and reducing waste.

Maximising drillhole straightness and continuity is important for an effective blast, while the blast design and charging systems used are also vital. Unsuitable drilling methods or equipment can quickly impact on efficiency, resulting in a heavy financial toll for an operation overall.

Poor blasting provides a series of problems that chip away at an operation’s cost-effectiveness. The most obvious effect of inefficient blasting is to deliver product that is oversized, requiring secondary breaking, while there may also be a high percentage of fines that have to go to waste. Poor blasting can also result in an uneven quarry floor, increasing wear and tear on loading and hauling equipment while lowering productivity. And poor blasting can have safety and environmental issues too, with a risk of flyrock as well as increased noise and vibration to the surroundings.

For more information on companies in this article

Related Content

  • New blasthole drillrigs from Sandvik
    December 8, 2014
    Sandvik is broadening its tophammer drill rig range with the introduction of two new models, the Pantera DPi 6.0 and Dino DC400Ri. The Pantera DPi 6.0 is a further development of the well-proven DPi series and now features a redesigned operating system combined with a completely new rockdrill. The redesigned control system has an updated user interface and touch screen, with support for new drill rig options and improved troubleshooting functions. In addition this revamped control system comes with improved
  • Excavation offering
    July 16, 2012
    There are various ways of building a tunnel, and for excavation jobs many contractors prefer to use versions of standard machines that have instead been converted to suit the confines of tunnelling applications. Some contractors opt to adapt their own units and with ventilation being an issue in underground work, engine emissions are a key focus when adapting machines. Exhaust filters and other after treatment solutions are usually required and there are an array of off-the-shelf packages available as well
  • UAE quarry facility boosting productivity
    May 15, 2015
    A United Arab Emirates quarry is putting its Volvo fleet to the test in harsh conditions A quarrying facility in the United Arab Emirates (UAE), is boosting output following the commissioning of a new machine fleet for loading and hauling duties. The quarry is located in the northeast of the UAE in Fujairah, an emirate almost entirely surrounded by mountains. This rugged landscape is the product of an estimated 800 million years of geological activity and is the source of a high quality limestone used in
  • Sandvik’s DT1131i jumbo and iSURE software in Iceland and Norway
    August 14, 2019
    Sandvik’s DT1131i three-boom, electro-hydraulic jumbo, iSURE tunnel management software and the latest drill bit hardware were recently put to the test in Iceland and Norway* Czech contractor Metrostav recently achieved 105m of tunnel excavation in a record-breaking six days. But it will be consistent performance and progress that will see Iceland’s Dyrafjordurgong Tunnel in the remote Westfjords region open on time and on budget. The 5.3km Dyrafjordurgong Tunnel is costing around €69 million and due