Skip to main content

Desert quarry supplies major road projects

Egyptian contractor Orascom has set up a new quarry site in the country's desert area, close to the city of Assuit. The quarry was opened specifically to supply Orascom's major road construction projects in this area of Egypt, with high quality aggregates.
February 10, 2012 Read time: 3 mins
Orascom's desert quarry is located close to the city of Assuit and supplies stone for three highway projects in the area

Quarry production shares many features worldwide. Mike Woof reports

Egyptian contractor 2414 Orascom has set up a new quarry site in the country's desert area, close to the city of Assuit. The quarry was opened specifically to supply Orascom's major road construction projects in this area of Egypt, with high quality aggregates.

At present Orascom is working on three separate highway construction projects that will link Assuit with capital Cairo to the north, the Red Sea to the east and Minya to the south. High quality stone from the quarry is used in the sub-base for the highways and is also used in the asphalt for the road surfacing, which is produced at Orascom's two 273 Marini batching plants that are located nearby. The firm also built the new civil/military 2545 Sohag Airport nearby, which is now open to air traffic and stone from the quarry was also used in the sub-base and asphalt for the runway, taxiway and road construction.

Although Orascom sold off its quarrying and cement operations to Lafarge some years ago the contractor realised it would need a facility to supply the road projects and airport construction with a steady supply of stone. Because of the comparatively short duration of these construction projects, Orascom decided it would be most logical to set-up and run its own operation.

This quarry is equipped with the latest 6934 Metso crushing, screening and conveying equipment, allowing it to deliver around 300tonnes/hour. Material is extracted using ripping and primary breaking techniques rather than by blasting. The quarry has a fleet that includes a 178 Caterpillar D10N and a D9N dozer as well as a 2300 Komatsu D475-3 dozer for ripping work and uses three 233 Hitachi ZX380-3 excavators equipped with hammers for primary breaking. Extraction by ripping and primary breaking suits the geology and also suits Orascom's equipment fleet with its large number of dozers and the firm's operator experience. In addition this method reduces the need for security associated with explosives storage and also eliminates the risk of micro-cracking in the product that can lead to stone being crushed during compaction operations at a construction site.

The processing operation is based around a 6934 Metso C100 crusher, along with Metso equipment for screening and conveying, producing the four stone sizes need for Orascom's nearby construction projects. Four Caterpillar wheeled loaders are used for loading and stocking duties and these load the six on - off highway trucks that carry broken material to the crushing plant. Because the quarry is located at a remote spot in the desert and is some distance from a water supply, dust suppression presented a challenge. As a result Orascom built the quarry office some distance from the working area and operators stay in the cabs of their machines, while personnel minimise dust exposure by keeping away from the crushing and screening plant when it is in operation.

For more information on companies in this article

Related Content

  • Crushing and screening advances introduced
    June 10, 2019
    New developments in crushing and screening equipment as well as washing technology will deliver benefits for materials production - Mike Woof writes Competition is tough in the market for quarry material processing equipment, with key firms introducing new systems that are said to boost capacity and performance. Firms offering crushing and screening equipment have expanded their respective ranges, offering additional capabilities for these segments. Mobility and versatility have been key factors in the d
  • Marini’s full recycling technology package
    November 26, 2018
    Marini is unveiling its advanced full recycling technology (FRT) mixing plant, which is said to meet customer needs for advanced asphalt recycling systems. In addition the firm has new asphalt plant developments, with one aimed at high output and the other designed for mobility. Designed to comply with the latest requirements on the use of recycled asphalt pavement (RAP) in key construction markets, the firm says that the FRT integrates an environmentally-friendly approach with an innovative mechanical str
  • MB in Indonesia at key exhibition
    March 7, 2018

    MB Crusher is keen to raise its profile in Asia, having seen a strong potential for its crushing and screening attachments. The firm exhibited at the recent Mining Indonesia 2017 event, together with its local partner PT Universal Tekno Reksajaya (a member of United Tractors group).

  • Universal concrete plant saves time and money
    February 29, 2012
    An Astec Universal concrete plant is said to be proving a real time and money saver for APAC Tennessee, thanks to its fast set-up and reduced cement demand. In March 2011, Astec, of Chattanooga, Tennessee, USA, shipped a new Universal concrete plant to the APAC Tennessee site on President's Island in Memphis, which is central between two APAC projects: a Memphis Airport runway project and an upcoming Tennessee Department of Transportation (TDOT) ramp reconstruction job.