Skip to main content

Desert quarry supplies major road projects

Egyptian contractor Orascom has set up a new quarry site in the country's desert area, close to the city of Assuit. The quarry was opened specifically to supply Orascom's major road construction projects in this area of Egypt, with high quality aggregates.
February 10, 2012 Read time: 3 mins
Orascom's desert quarry is located close to the city of Assuit and supplies stone for three highway projects in the area

Quarry production shares many features worldwide. Mike Woof reports

Egyptian contractor 2414 Orascom has set up a new quarry site in the country's desert area, close to the city of Assuit. The quarry was opened specifically to supply Orascom's major road construction projects in this area of Egypt, with high quality aggregates.

At present Orascom is working on three separate highway construction projects that will link Assuit with capital Cairo to the north, the Red Sea to the east and Minya to the south. High quality stone from the quarry is used in the sub-base for the highways and is also used in the asphalt for the road surfacing, which is produced at Orascom's two 273 Marini batching plants that are located nearby. The firm also built the new civil/military 2545 Sohag Airport nearby, which is now open to air traffic and stone from the quarry was also used in the sub-base and asphalt for the runway, taxiway and road construction.

Although Orascom sold off its quarrying and cement operations to Lafarge some years ago the contractor realised it would need a facility to supply the road projects and airport construction with a steady supply of stone. Because of the comparatively short duration of these construction projects, Orascom decided it would be most logical to set-up and run its own operation.

This quarry is equipped with the latest 6934 Metso crushing, screening and conveying equipment, allowing it to deliver around 300tonnes/hour. Material is extracted using ripping and primary breaking techniques rather than by blasting. The quarry has a fleet that includes a 178 Caterpillar D10N and a D9N dozer as well as a 2300 Komatsu D475-3 dozer for ripping work and uses three 233 Hitachi ZX380-3 excavators equipped with hammers for primary breaking. Extraction by ripping and primary breaking suits the geology and also suits Orascom's equipment fleet with its large number of dozers and the firm's operator experience. In addition this method reduces the need for security associated with explosives storage and also eliminates the risk of micro-cracking in the product that can lead to stone being crushed during compaction operations at a construction site.

The processing operation is based around a 6934 Metso C100 crusher, along with Metso equipment for screening and conveying, producing the four stone sizes need for Orascom's nearby construction projects. Four Caterpillar wheeled loaders are used for loading and stocking duties and these load the six on - off highway trucks that carry broken material to the crushing plant. Because the quarry is located at a remote spot in the desert and is some distance from a water supply, dust suppression presented a challenge. As a result Orascom built the quarry office some distance from the working area and operators stay in the cabs of their machines, while personnel minimise dust exposure by keeping away from the crushing and screening plant when it is in operation.

For more information on companies in this article

Related Content

  • Effective dust control
    February 13, 2012
    Dealing with nuisance dust is an issue for almost every quarry and for those operating in the tropical paradise of the Caribbean, it is no different. One Trinidad-based quarry operator has recently tackled the problem and is seeing benefits for its workers, neighbours and its machine service life too.
  • Effective dust control
    April 12, 2012
    Dealing with nuisance dust is an issue for almost every quarry and for those operating in the tropical paradise of the Caribbean, it is no different. One Trinidad-based quarry operator has recently tackled the problem and is seeing benefits for its workers, neighbours and its machine service life too. Trinidad Cement Limited (TCL) extracts around 1.1million tonnes of limestone each year from its quarry in Mayo, Central Trinidad but had a history of problems with dust. "In the past, our crews had done
  • Asphalt plant innovations coming to the market
    April 20, 2018
    The use of recycled materials continues to be a key issue for asphalt plant development, but other advances are also being introduced to meet market needs - Mike Woof writes The asphalt plant market has been a focus for a series of technical developments in recent years. Warm asphalt solutions and new technology for the use of recycled asphalt have been high on the R&D priority list for manufacturers of both continuous and batching type plants. However, new developing technology is not the only driver f
  • Wirtgen: low-emission recycling near Legoland
    March 22, 2024
    Wirtgen, Vögele and Hamm were on a section of the busy E45 highway close to the famous Legoland resort at Billlund, Denmark.