Skip to main content

Desert quarry supplies major road projects

Egyptian contractor Orascom has set up a new quarry site in the country's desert area, close to the city of Assuit. The quarry was opened specifically to supply Orascom's major road construction projects in this area of Egypt, with high quality aggregates.
February 10, 2012 Read time: 3 mins
Orascom's desert quarry is located close to the city of Assuit and supplies stone for three highway projects in the area

Quarry production shares many features worldwide. Mike Woof reports

Egyptian contractor 2414 Orascom has set up a new quarry site in the country's desert area, close to the city of Assuit. The quarry was opened specifically to supply Orascom's major road construction projects in this area of Egypt, with high quality aggregates.

At present Orascom is working on three separate highway construction projects that will link Assuit with capital Cairo to the north, the Red Sea to the east and Minya to the south. High quality stone from the quarry is used in the sub-base for the highways and is also used in the asphalt for the road surfacing, which is produced at Orascom's two 273 Marini batching plants that are located nearby. The firm also built the new civil/military 2545 Sohag Airport nearby, which is now open to air traffic and stone from the quarry was also used in the sub-base and asphalt for the runway, taxiway and road construction.

Although Orascom sold off its quarrying and cement operations to Lafarge some years ago the contractor realised it would need a facility to supply the road projects and airport construction with a steady supply of stone. Because of the comparatively short duration of these construction projects, Orascom decided it would be most logical to set-up and run its own operation.

This quarry is equipped with the latest 6934 Metso crushing, screening and conveying equipment, allowing it to deliver around 300tonnes/hour. Material is extracted using ripping and primary breaking techniques rather than by blasting. The quarry has a fleet that includes a 178 Caterpillar D10N and a D9N dozer as well as a 2300 Komatsu D475-3 dozer for ripping work and uses three 233 Hitachi ZX380-3 excavators equipped with hammers for primary breaking. Extraction by ripping and primary breaking suits the geology and also suits Orascom's equipment fleet with its large number of dozers and the firm's operator experience. In addition this method reduces the need for security associated with explosives storage and also eliminates the risk of micro-cracking in the product that can lead to stone being crushed during compaction operations at a construction site.

The processing operation is based around a 6934 Metso C100 crusher, along with Metso equipment for screening and conveying, producing the four stone sizes need for Orascom's nearby construction projects. Four Caterpillar wheeled loaders are used for loading and stocking duties and these load the six on - off highway trucks that carry broken material to the crushing plant. Because the quarry is located at a remote spot in the desert and is some distance from a water supply, dust suppression presented a challenge. As a result Orascom built the quarry office some distance from the working area and operators stay in the cabs of their machines, while personnel minimise dust exposure by keeping away from the crushing and screening plant when it is in operation.

For more information on companies in this article

Related Content

  • Technology helps earth moving and paving
    August 18, 2014
    Located in Meeker, Colorado and serving the area for air transportation is Meeker Airport, a C-II general aviation airport. The FAA designation of C-II means the airport can accommodate aircraft with wingspan of less than 24m. Runway 3-21 at the Rio Blanco county-owned Meeker Airport had reached a point of wear and deterioration that required full reconstruction and upgrades to remain compliant with the FAA’s C-II requirements.
  • Ground control to mining truck offers efficiency gains
    June 19, 2015
    Autonomous and remote control machines are not about to take over the world, but they can provide efficiency gains and savings in some operations – Colin Sowman writes The thought of autonomous machines may conjure up visions of an Orwellian future where society works for the ‘common good’ defined by an all-powerful being and in which people are insignificant in terms of their needs, aspirations and physical wellbeing; of machines that relentlessly carry out their task regardless of anybody or anything that
  • Airport runway rebuild at Bologna
    May 15, 2019
    Rebuilding a runway requires special attention to detail to maximise efficiency and safety Airport runways face special challenges with regard to the loads they carry on a daily basis, particularly when aircraft are landing. A modern jet aircraft will typically land at speeds of around 240-260km/h, with a laden 747 weighing as much as 265tonnes at the end of a long flight. The stresses these large aircraft place on runway surfaces are enormous and not just with the massive impact forces exerted during
  • Asphalt plant operators offer fuel for thought
    August 28, 2013
    Asphalt plant operators across continental Europe are said to be increasingly turning to pulverized lignite to fuel or partially fuel production, while leading plant manufacturers have been busy closing key deals with customers in Russia, Bangladesh and Switzerland. Guy Woodford reports. Financially astute asphalt plant operators in Europe are said to be increasingly using pulverized lignite, also known as brown coal, from Germany to fuel or partially fuel production. Under the product name ‘Lignite Energ