Skip to main content

Desert quarry supplies major road projects

Egyptian contractor Orascom has set up a new quarry site in the country's desert area, close to the city of Assuit. The quarry was opened specifically to supply Orascom's major road construction projects in this area of Egypt, with high quality aggregates.
February 10, 2012 Read time: 3 mins
Orascom's desert quarry is located close to the city of Assuit and supplies stone for three highway projects in the area

Quarry production shares many features worldwide. Mike Woof reports

Egyptian contractor 2414 Orascom has set up a new quarry site in the country's desert area, close to the city of Assuit. The quarry was opened specifically to supply Orascom's major road construction projects in this area of Egypt, with high quality aggregates.

At present Orascom is working on three separate highway construction projects that will link Assuit with capital Cairo to the north, the Red Sea to the east and Minya to the south. High quality stone from the quarry is used in the sub-base for the highways and is also used in the asphalt for the road surfacing, which is produced at Orascom's two 273 Marini batching plants that are located nearby. The firm also built the new civil/military 2545 Sohag Airport nearby, which is now open to air traffic and stone from the quarry was also used in the sub-base and asphalt for the runway, taxiway and road construction.

Although Orascom sold off its quarrying and cement operations to Lafarge some years ago the contractor realised it would need a facility to supply the road projects and airport construction with a steady supply of stone. Because of the comparatively short duration of these construction projects, Orascom decided it would be most logical to set-up and run its own operation.

This quarry is equipped with the latest 6934 Metso crushing, screening and conveying equipment, allowing it to deliver around 300tonnes/hour. Material is extracted using ripping and primary breaking techniques rather than by blasting. The quarry has a fleet that includes a 178 Caterpillar D10N and a D9N dozer as well as a 2300 Komatsu D475-3 dozer for ripping work and uses three 233 Hitachi ZX380-3 excavators equipped with hammers for primary breaking. Extraction by ripping and primary breaking suits the geology and also suits Orascom's equipment fleet with its large number of dozers and the firm's operator experience. In addition this method reduces the need for security associated with explosives storage and also eliminates the risk of micro-cracking in the product that can lead to stone being crushed during compaction operations at a construction site.

The processing operation is based around a 6934 Metso C100 crusher, along with Metso equipment for screening and conveying, producing the four stone sizes need for Orascom's nearby construction projects. Four Caterpillar wheeled loaders are used for loading and stocking duties and these load the six on - off highway trucks that carry broken material to the crushing plant. Because the quarry is located at a remote spot in the desert and is some distance from a water supply, dust suppression presented a challenge. As a result Orascom built the quarry office some distance from the working area and operators stay in the cabs of their machines, while personnel minimise dust exposure by keeping away from the crushing and screening plant when it is in operation.

For more information on companies in this article

Related Content

  • Building Egypt's world class Desert Highway
    April 13, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports. The work to upgrade the Desert Highway connecting Egypt's sprawling capital Cairo with its major port Alexandria, is one of the country's largest infrastructure projects for many years. This 220km highway link is being widened and improved to cope with the hugely increased traffic volumes resulting partly from Egypt's fast growing vehicle population. The Egyptian economy is strong
  • Building Egypt's world class Desert Highway
    February 9, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports
  • Major producer of road construction materials
    February 10, 2012
    The Simge Group operates a massive and highly modern quarrying operation close to the Turkish city of Bursan, which provides a major supply of aggregates and asphalt to the country's highway construction sector. This quarry produces around 4 million tonnes/year of crushed limestone and is the largest of the five quarries the Simge Group runs in Turkey, which have a combined output of 12 million tonnes/year. The huge site has an asphalt output of 500,000tonnes/year, again a significant portion of the 1.2 mil
  • Chinese quarry increasing size of Caterpillar fleet
    December 10, 2013
    Chinese quarry producer Beijing Xindadi Equipment Company is looking to increase the size of its Caterpillar machine fleet as part of its plan to increase output The company is based at Beijing Miyun Taishi Village and currently produces 1-1.5 million tonnes/year of limestone, which is used for general construction in the Beijing area. Zhang Guofeng is equipment manager for the firm and said, “Business is good because the market is not affected by the downturn.”