Skip to main content

A new tunnel forming part of Albania’s Tirana-Elbasan highway is due to open in May

The authorities in Albania are planning to open a new tunnel that will form part of the Tirana-Elbasan highway. This new link is currently under construction and is due to be opened in early May 2012. The tunnel is 4.3km long and is around 66% complete.
April 3, 2012 Read time: 1 min
The authorities in Albania are planning to open a new tunnel that will form part of the Tirana-Elbasan highway. This new link is currently under construction and is due to be opened in early May 2012. The tunnel is 4.3km long and is around 66% complete.

Related Content

  • Copy of New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk
  • Stuttgart’s Rosenstein Tunnel to open in March
    March 1, 2022
    Cost of the project, part of a larger interchange plan for the German city, is around €416 million.
  • Slovakia starts on Presov northern bypass
    August 15, 2019
    Work has started on the first stage of the 4.3km-long Presov northern bypass, part of the R4 speedway in eastern Slovakia.
  • New tunnel link in Serbia’s capital Belgrade
    April 16, 2012
    Works on Serbia’s Strazevica tunnel is due for completion in May 2012. The tunnel forms part of the Belgrade ringroad. Serbia’s Government is also planning to finish the construction of a total of 200km of the Corridor 10 motorway, following the completion of the Strazevica-Bubanj and Batajnica-Dobanovci sections. Work on the remaining 130km will commence soon. Meanwhile work on the Ljig-Preljina section of Corridor 11 is now underway.