Skip to main content

New airport for Papua New Guinea

A new airport has been constructed in the southern highlands of Papua New Guinea that will help with communications and logistics for the development of a natural gas project in the area. Built at Komo, the airport is sufficiently large to be able to handle the massive Russian Antonov AH-124-100 transport aircraft. Construction of the airport however proved challenging as the climate in this mountainous area is known for its changeable weather and heavy seasonal rainfall. However the airport was need
August 21, 2013 Read time: 3 mins
Building a facility able to handle large aircraft proved extremely challenging due to the climate, the remote location and the difficult terrain

A new airport has been constructed in the southern highlands of Papua New Guinea that will help with communications and logistics for the development of a natural gas project in the area.

Built at Komo, the airport is sufficiently large to be able to handle the massive Russian Antonov AH-124-100 transport aircraft. Construction of the airport however proved challenging as the climate in this mountainous area is known for its changeable weather and heavy seasonal rainfall.

However the airport was needed so as to allow the shipment of heavy equipment to the remote Hides area, with the Antonov destined to make 70 flights to the facility, carrying components. The natural gas operation is run by a subsidiary of Exxon Mobil. The gas will be sourced from the Hides, Angore and Juha gas fields as well as the associated Kutubu, Agogo, Moran and Gobe regions.  The project involves the installation of over 700km of pipelines and the Hides facility will treat the natural gas and condensate.

The PNG LNG consortium consists of seven different companies including ExxonMobil, Oil Search, state-owned National Petroleum Company of PNG, Santos, JX Nippon, landowner interest manager Mineral Resources Development Company and state-owned Petromin. However because of the remote nature of the site and the fast changing climactic conditions, construction proved challenging for 2673 McConnell Dowell and Consolidated Contractors (MCJV), which built the Komo Airfield under contract for ExxonMobil. The work involved construction of a 3.2km long by 45m wide runway, as well as all airport infrastructure, including a terminal building, runway lighting, communication facilities and fuel storage. More than 9,000,000m3 of earth was moved and 55,000tonnes of asphalt was laid on the runway’s surface.
The MCJV partners used a wide array from Volvo Construction Equipment for the work, with 71 different items of machinery. These 359 Volvo CE units including 21 A40E ADTs, 27 EC460CL excavators, eight G990 B-Series graders, six L180F/L150F wheeled loaders, two Volvo 7820B pavers, two PT240R rubber tyred compactors, 15 Volvo soil compactors with five different units used, two BL61 B-Series backhoe loaders and two A35E articulated haulers modified as bowsers to hold 40,000 litres of water. The contracting team had to contend with mud slides and poor road conditions, although the weather proved a particular challenge with an estimated 50 million litres of rainfall.

About 80% of the machines that arrived on site were brand new and each machine clocked up 6,000 to 7,000 hours on average. Having been scrupulously well maintained all of the machines were still in good operational condition after the completion of the airfield and were ready to be transferred to other job sites. Many of the articulated haulers have since been bought by Exxon Mobil for other areas of the PNG LNG project.

For more information on companies in this article

Related Content

  • Volvo CE machines in Indonesia quarry
    November 20, 2015
    The operation is now using one of the EC220DL excavator models, which has helped boost productivity by some 30%. In addition, the machine is said to be delivering savings in running costs at the Alam Jaya volcanic rock quarry, through reducing fuel consumption by two litres/hour. The site is located close to West Java’s capital city, Bandung, at the foot of the volcano, Tangkuban Perahu. The city is home to 2.5 million people and sits at 768m above sea level, while it benefits from one of Indonesia’s coo
  • Latest developments in construction machines
    April 4, 2012
    High performance backhoe loaders from Hidromek can compete with leading brands on performance - Mike Woof reports Turkish manufacturer Hidromek is looking to take a larger slice of the international market with its newly upgraded backhoe loader models. The firm currently sells machines in 50 countries worldwide and intends to boost its market profile. Marketing manager Levent Karaa aç said, "We will be a global brand." This family owned firm has come a long way since it was founded in 1978, manufacturing a
  • Latest developments in construction machines
    February 14, 2012
    High performance backhoe loaders from Hidromek can compete with leading brands on performance - Mike Woof reports
  • Hot work for GOMACO at Doha airport
    November 2, 2012
    The country of Qatar, located on the Persian Gulf, developed a master plan to build a new replacement airport in its capital city of Doha, the New Doha International Airport, in 2003. Its goal is to have a facility capable of handling 50 million passengers; two million tons (1.8million tonnes) of cargo, and 320,000 aircraft landings and take-offs each year by 2015. Phase one of the aggressive project is scheduled for completion early next year. The Tayseeir Contractors Company Joint Venture, including Conso