Skip to main content

New airport for Papua New Guinea

A new airport has been constructed in the southern highlands of Papua New Guinea that will help with communications and logistics for the development of a natural gas project in the area. Built at Komo, the airport is sufficiently large to be able to handle the massive Russian Antonov AH-124-100 transport aircraft. Construction of the airport however proved challenging as the climate in this mountainous area is known for its changeable weather and heavy seasonal rainfall. However the airport was need
August 21, 2013 Read time: 3 mins
Building a facility able to handle large aircraft proved extremely challenging due to the climate, the remote location and the difficult terrain

A new airport has been constructed in the southern highlands of Papua New Guinea that will help with communications and logistics for the development of a natural gas project in the area.

Built at Komo, the airport is sufficiently large to be able to handle the massive Russian Antonov AH-124-100 transport aircraft. Construction of the airport however proved challenging as the climate in this mountainous area is known for its changeable weather and heavy seasonal rainfall.

However the airport was needed so as to allow the shipment of heavy equipment to the remote Hides area, with the Antonov destined to make 70 flights to the facility, carrying components. The natural gas operation is run by a subsidiary of Exxon Mobil. The gas will be sourced from the Hides, Angore and Juha gas fields as well as the associated Kutubu, Agogo, Moran and Gobe regions.  The project involves the installation of over 700km of pipelines and the Hides facility will treat the natural gas and condensate.

The PNG LNG consortium consists of seven different companies including ExxonMobil, Oil Search, state-owned National Petroleum Company of PNG, Santos, JX Nippon, landowner interest manager Mineral Resources Development Company and state-owned Petromin. However because of the remote nature of the site and the fast changing climactic conditions, construction proved challenging for 2673 McConnell Dowell and Consolidated Contractors (MCJV), which built the Komo Airfield under contract for ExxonMobil. The work involved construction of a 3.2km long by 45m wide runway, as well as all airport infrastructure, including a terminal building, runway lighting, communication facilities and fuel storage. More than 9,000,000m3 of earth was moved and 55,000tonnes of asphalt was laid on the runway’s surface.
The MCJV partners used a wide array from Volvo Construction Equipment for the work, with 71 different items of machinery. These 359 Volvo CE units including 21 A40E ADTs, 27 EC460CL excavators, eight G990 B-Series graders, six L180F/L150F wheeled loaders, two Volvo 7820B pavers, two PT240R rubber tyred compactors, 15 Volvo soil compactors with five different units used, two BL61 B-Series backhoe loaders and two A35E articulated haulers modified as bowsers to hold 40,000 litres of water. The contracting team had to contend with mud slides and poor road conditions, although the weather proved a particular challenge with an estimated 50 million litres of rainfall.

About 80% of the machines that arrived on site were brand new and each machine clocked up 6,000 to 7,000 hours on average. Having been scrupulously well maintained all of the machines were still in good operational condition after the completion of the airfield and were ready to be transferred to other job sites. Many of the articulated haulers have since been bought by Exxon Mobil for other areas of the PNG LNG project.

For more information on companies in this article

Related Content

  • Yeti more autonomous snow-clearing by Semcon
    January 9, 2019
    Semcon, a Swedish applied automation company, said it has started an on-site project to clear snow from runway landing lights using autonomous vehicles. Most often the time-consuming job of clearing snow around landing lights has to be done manually because of the intricate maneouvres needed to avoid damaging the lighting systems. The trial project, which started this month, will be demonstrated in about a year’s time at Örnsköldsvik Airport, around 525km north of the Swedish capital Stockholm, accord
  • Volvo Group opens SDLG excavator factory in Brazil
    August 9, 2013
    Production has started in Brazil of excavators from Shandong Lingong Construction Machinery (Lingong). The SDLG-branded machines will be built in a US$10 million purpose-built assembly hall within the Volvo Group site in Pederneiras, São Paulo state. Initially, four SDLG crawler excavator models will be produced at the new facility – the LG6150E, LG6210E, LG6225E and LG6250E models, covering weight classes from 13.8tonnes to 24.3tonnes. The excavators will be sold to companies working in a variety of indust
  • SDLG wheeled loaders for Moscow’s new roads and buildings
    March 28, 2014
    Two factories in Russia’s greater Moscow region are using SDLG wheeled loaders to help distribute sand and gravel for use in new roads being built across the region With Russia one of the world’s fastest growing market economies, its need for infrastructure expansion has meant more roads and, as a result, a massive increased need for sand and gravel production. Two sand and gravel factories near Moscow are said to be helping produce the new roads, sidewalks, and also, buildings.
  • Brazil’s booming economy fuels infrastructure demand
    January 9, 2013
    The emergence of Brazil as a major economic force and its need to improve infrastructure is proving a magnet for investment. Patrick Smith reports. Brazil is now the sixth biggest economy in the world according to its Finance Minister Guido Mantega. The largest country in South America with a population of 190 million and one of the BRICS, (Brazil, Russia, India, China, South Africa, Brazil’s economy grew 2.7% in 2011 and is now worth $2.5 trillion, having overtaken the UK. With big oil and gas reserves sti