Skip to main content

Tunnelling in Montenegro with XCMG equipment

Tunnelling equipment from Chinese firm XCMG has played an important role in a project in Montenegro. The work was carried out by contractor CCCC Tunnel Engineering Company and involved the excavation of the Jabuka Tunnel Works. This link forms part of the North-South Expressway of Montenegro and was completed on schedule recently. The link is of note as it is the first-ever expressway in Montenegro. Due to the country’s hills, a stretch of tunnel was a necessity.
October 19, 2017 Read time: 1 min
Tunnelling machines from XCMG have played a key role in driving a new tunnel in Montenegro

Tunnelling equipment from Chinese firm 2490 XCMG has played an important role in a project in Montenegro. The work was carried out by contractor CCCC Tunnel Engineering Company and involved the excavation of the Jabuka Tunnel Works. This link forms part of the North-South Expressway of Montenegro and was completed on schedule recently. The link is of note as it is the first-ever expressway in Montenegro. Due to the country’s hills, a stretch of tunnel was a necessity.

CCCC Tunnel Engineering Company opted to use two XCMG XTR260 tunnel boring machines for the task. As expected, the tunnel boring machines performed splendidly, and broke several records in the history of local project construction.

For more information on companies in this article

Related Content

  • Zambia road rebuild by mining firm
    May 30, 2017
    A key road rebuild contract has been carried out in Zambia by mining firm First Quantum Minerals (FQM). The firm used its own equipment to rebuild a road that connects with its mining operations in Zambia’s North-Western Province. The firm opted to maintain the Chingola-Solwezi road, which had deteriorated to such a state that North-Western Province faced being cut-off from the rest of the country during the rainy season. This was a serious issue for the mining firm as the poor state of the road threatened
  • Peru’s Matarani – Punta de Bonbon Highway
    January 5, 2016
    A major new highway project in Peru will improve connectivity for the Arequipa region - Mauro Nogarin writes Peru’s Matarani-Bonbon road project is an important route and forms part of the Camana - Dv Quilca - Ilo - Tacna highway project. The road stretches through several provinces in the Arequipa region. The deadline for completing the work is 720 days after January 2015, and it is scheduled to be completed by December 2016. Progress has been good and as of July 2015, it was 80% completed. The main
  • Earthmoving solutions on Portugal's longest road
    February 17, 2012
    Portuguese contractor Mota-Engil Group has been awarded the construction of a 270km Douro Interior Highways project in the north-east of Portugal, one of the longest highway projects ever awarded in the country.
  • Controlled demolition development
    January 25, 2017
    The development of reliable hydraulic attachments has brought a revolution in demolition technology. The hydraulic breaker, pioneered by the Krupp and Montabert brands, has firmly taken hold with a huge range of manufacturers now offering machines. Hydraulic attachment specialists such as Atlas Copco, Indeco and Sandvik (with its Rammer brand) now offer a range of tools that can deliver high efficiency and safety in demolition work. Meanwhile, developments with smaller tools offer productive methods for rep