Skip to main content

Sandvik loaders aid Russian project

Sandvik Mining and Construction has signed an agreement with Bamtonnelstroy JSC covering the delivery of six LH 410 underground loaders (LHDs) featuring an innovative side-tipping bucket option. The loaders, being delivered in two lots, each have a capacity of up to 10tonnes and a bucket size of 4.6m³.
February 29, 2012 Read time: 2 mins
A Sandvik Mining and Construction LH 410 underground loader: six have been bought for use on a Russian highway project
325 Sandvik Mining and Construction has signed an agreement with Bamtonnelstroy JSC covering the delivery of six LH 410 underground loaders (LHDs) featuring an innovative side-tipping bucket option.

The loaders, being delivered in two lots, each have a capacity of up to 10tonnes and a bucket size of 4.6m³.

Bamtonnelstroy JSC is a pioneer in the use of cutting-edge Sandvik machinery equipped with a side-tipping bucket for underground construction in Russia.

The order will complete the full range of Sandvik equipment used by Bamtonnelstroy JSC in the construction of road and railway tunnels in Russia (these also include drill rigs, rock reinforcement machines and road headers).

The company has the largest fleet of Sandvik machinery owned by a Russian company in the construction of underground facilities, and the loaders will be used primarily in the construction of tunnels for the new Adler-Roza Khutor highway, a vital link for the 2014 Winter Olympic Games being held at the Black Sea resort of Sochi. It will connect the Olympic Village and the Roza Khutor ski resort.

According to Sandvik the LH 410's fully automatic control system will reduce maintenance costs and save time in tunneling operations with the use of a side-tipping bucket reducing cost per tonne for transported rock mass.

"The equipment has proved its reliability and Sandvik tunnelling machines have enabled us to efficiently achieve our objectives within the adjusted time period," said Victor Balandin, chief engineer at Bamtonnelstroy JSC.

For more information on companies in this article

Related Content

  • Sochi, Russia gets 260km of new roads for 2014 Winter Olympics
    May 23, 2013
    The Russian city of Sochi is gaining 260km of roads as part of a US$47.75 billion (RUB 1.5tn) investment in preparations for the 2014 Winter Olympics. Some $20.05 billion (RUB 627bn) has been allotted for transport – including the new Sochi roads. As a result of the new roads, the city’s traffic capacity will rise 1.8-2.5 times, while traffic speed will go up 25%. Of the overall Winter Olympics preparation budget, $7 billion (RUB 219bn) is being spent on Olympic facilities, while the rest has been provided
  • Upgrade for Russian quarry
    February 22, 2012
    In Russia, the Ministry for Industry established the Gurovo Beton quarry in the Tula region south of Moscow in 1951.
  • Modern formwork systems - fast, flexible, safe
    February 21, 2012
    Speed of erection, safety, cost-efficiency and flexibility are among the attributes of modern formwork systems. Modern formwork and scaffolding systems are attractive in particular for their speed of erection, safety, cost-efficiency and flexibility.
  • Sophisticated tunnelling option
    July 20, 2012
    Sandvik is rolling out a range of sophisticated tunnelling jumbo drilling rigs, equipped with advanced automation features. The new DTi models feature wide coverage and powerful HX5T drifters that enable them to carry out large and small and tunnelling jobs. To optimise operation, the four machines can use Sandvik's latest iSURE software, which allows blasting operations to be designed on a PC and then downloaded onto the rigs using conventional USB memory sticks: this allows full automation of the face dri