Skip to main content

Rammer’s tough breakers for tunnelling

Based on customer demand for new, extreme duty hydraulic breakers, Rammer is launching two new PRO hammers. The Rammer 2577 PRO and Rammer 5011 PRO are said to be innovative and tough.
March 31, 2016 Read time: 2 mins
Tough and reliable, Rammer’s new breakers can be used for tunnelling applications
Based on customer demand for new, extreme duty hydraulic breakers, 5076 Rammer is launching two new PRO hammers.

The Rammer 2577 PRO and Rammer 5011 PRO are said to be innovative and tough. Suitable for carriers in the 21-32tonne and 43-80tonne weight ranges respectively, the new breakers have been specifically designed to work horizontally and undertake tunnelling duties in hard rock, being purpose built to withstand high levels of dust.

The 1.94tonne Rammer 2577 PRO and the 5.3tonne Rammer 5011 PRO are both based on the field-proven Rammer 2577 and 5011 hammers. These new models share key proven features that allow them to work in tough tunnelling duties. Both new models have an idle blow protector that provides greater levels of protection. Additionally they are equipped with long-life, high-tension VIDAT tie rods for improved reliability, extended service periods and lower operating costs.

Customers choosing the PRO range will be able to benefit from a sealed housing structure that prevents the ingress of dust and dirt, extending the working life of the hammer and the tool. A top cover plate has sealed through apertures for stump hydraulic hoses, and features sealed hose connections for grease, air and water.

The PRO hammers feature a sturdy housing design and wear resistant components to allow horizontal working duties. The Rammer PRO range models are also offered with special tools for horizontal primary breaking which have been designed to work with a broad range of auxiliary systems.

For customers working in tunnelling applications, Rammer has put together a package of auxiliary systems and solutions: the AGW unit. These have been designed to protect the hammer from the demands of this extreme application, delivering lower owning and operating costs. Special features include the proven Ramair air flush system that prevents potentially harmful dust ingress; the Ramlube I automatic lubrication system to ensure consistent and thorough greasing; and the water jet dust suppression package to minimise the creation of dust during breaking.

Hydraulically-actuated and requiring no additional power supply, the AGW Unit is said to be easy and safe to install and maintain.

For more information on companies in this article

Related Content

  • New asphalt paving technologies boost performance
    February 28, 2012
    Sophisticated new paving technologies are coming to market that will help boost quality and performance. New paving technologies are being introduced to meet the differing demands of both North American and European customers. Although North American and European paving techniques do vary, there are also some control technologies being introduced that will help quality for both approaches.
  • New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk
  • Italy road tunnel project excavated
    July 9, 2018
    Italy’s A3 Highway is being upgraded, which will improve transport between Salerno and Calabria. Upgrading Italy’s A3 highway is of prime importance for developing the south of the country and is a project that has been prioritised for construction. The A3 Salerno-Reggio-Calabria highway is a non-toll road managed by ANAS, Italy’s state-owned company that constructs and maintains highways. The route runs a total of 443km, with the road having originally been built between 1966 and 1974. However, the origina
  • An array of crushing and screening innovations was presented at the recent INTERMAT 2012 exhibition
    July 19, 2012
    The crushing and screening phase is a crucial component in aggregate production and new development will help optimise performance - Mike Woof reports Crushing and screening is a key part of the quarrying cycle and has a huge impact on overall operating performance. Optimising operations will cut running costs, reduce materials wastage and also provide a more consistent product quality, boosting cost-effectiveness dramatically. An array of innovations were revealed to the market at the recent INTERMAT 2012