Skip to main content

Mexico’s longest tunnel project being excavated

Congestion is particularly bad on the road from the city centre to Juan Álvarez international airport. Jams are frequent on the section of road between Acapulco Bay and the Diamante and Puerto Marques suburbs, which currently means climbing La Escénica. To tackle the problem the city authorities decided to build the new tunnel and bypass the traffic jams. The route of the 3.2km tunnel runs under the Cumbres de Llano Largo mountain. The contract for excavating the two tunnels was awarded to the Aca-Túnel con
July 18, 2017 Read time: 3 mins
Indeco has experience in configuring its breakers for use in tunnelling
RSSTwo specially configured hydraulic breakers from Indeco are being used in the project to construct Mexico’s longest tunnel. The HP 3000 ABF units are being used at the Aca-Túnel jobsite in Acapulco to help build the new tunnel, which is intended to reduce congestion in one of Mexico’s most popular tourist destinations

Congestion is particularly bad on the road from the city centre to Juan Álvarez international airport. Jams are frequent on the section of road between Acapulco Bay and the Diamante and Puerto Marques suburbs, which currently means climbing La Escénica. To tackle the problem the city authorities decided to build the new tunnel and bypass the traffic jams. The route of the 3.2km tunnel runs under the Cumbres de Llano Largo mountain.

The contract for excavating the two tunnels was awarded to the Aca-Túnel consortium, which comprises the privately held firms 2765 ICA and CARSO, two of Mexico’s key contractors.

Maquinter, Indeco’s distributor in Mexico, sells and rents out construction machinery equipment in various different states in the country. The consortium, Aca-Túnel, sent the distributor a provisioning request for Indeco hydraulic breakers. Indeco units had recently been used successfully by ICA in Oaxaca State on a road-building project, which strongly influenced the decision to opt for breakers from the same supplier. The two HP 3000 ABFs (HP 5000s in the US), have been mounted on 178 Caterpillar 320 excavators.

“Tunnelling is a particularly tough application for hydraulic hammers, due to the special conditions they are required to work under,” explained Indeco’s marketing manager Michele Vitulano. In tunnelling jobs there is more dust around the breaker than for quarrying work, due to the enclosed nature of the operating area. To prevent the risk of extra wear, additional water damping and tool greasing technology is often used in tunnelling jobs. Working temperatures can also be higher in tunnelling as there is less airflow, so hydraulics need extra cooling. And as breakers often have to be operated horizontally or even pointing upwards in tunnelling work, further measures are needed to provide protection for the internal working components.

However, as hydraulic breakers have been used successfully in Italian tunnelling projects for many years, Indeco has plenty of experience in configuring its units for use in this type of application

For more information on companies in this article

Related Content

  • Tunnel breakthrough for new Auckland link in New Zealand
    October 8, 2014
    Auckland’s Western Ring Route project update - Mary Bell writes. A number of integrated projects in Auckland, New Zealand, will improve the lot of road users and cyclists, and significantly alter the topography of the city’s motorway. On September 29th the tunnel boring machine digging the first of twin road tunnels beneath the city broke into daylight after 10 months underground. The new 2.4km-long Waterview tunnels will connect the city’s Northwestern and Southwestern motorways, each carrying three lane
  • Drilling's novel solutions
    July 23, 2012
    In the drilling and hydraulic attachment sectors too, firms are offering novel solutions for the customer. Atlas Copco continues to develop its comprehensive range of drilling solutions in the shape of its latest down-the-hole (DTH) and SmartRig variants, as well as adding new compact rigs and new consumables to the line-up. The firm's latest Roc L630 DTH rig benefits from a new feed as well as improved cooling. The new aluminium feed is said to improve hole straightness and hole quality. It also allows the
  • Developments in cycle way monitoring
    February 13, 2012
    A new cycle way monitoring system developed by consultant Cowi and laser electronics company Dynatest in Denmark adds a new dimension to monitoring local road networks. It is developed from standard road condition measurements but is specially tailored for the bicycle path and the particular ride conditions needed for cyclists. The need is growing as the bicycle lane becomes increasingly important around the world. In London a number of special bicycle "super highways" have been introduced, marking off bicy
  • Bridges and tunnels tackle congestion problems
    February 29, 2012
    In preparation for the 2014 Olympic Winter Games, the Black Sea health resort of Sotschi, Russia, is tackling its growing traffic jam problems.A 13km bypass and a new main road passing mainly under the city involves the construction of 15 tunnels and a number of bridges and flyovers.