Skip to main content

Mexico’s longest tunnel project being excavated

Congestion is particularly bad on the road from the city centre to Juan Álvarez international airport. Jams are frequent on the section of road between Acapulco Bay and the Diamante and Puerto Marques suburbs, which currently means climbing La Escénica. To tackle the problem the city authorities decided to build the new tunnel and bypass the traffic jams. The route of the 3.2km tunnel runs under the Cumbres de Llano Largo mountain. The contract for excavating the two tunnels was awarded to the Aca-Túnel con
July 18, 2017 Read time: 3 mins
Indeco has experience in configuring its breakers for use in tunnelling
RSSTwo specially configured hydraulic breakers from Indeco are being used in the project to construct Mexico’s longest tunnel. The HP 3000 ABF units are being used at the Aca-Túnel jobsite in Acapulco to help build the new tunnel, which is intended to reduce congestion in one of Mexico’s most popular tourist destinations

Congestion is particularly bad on the road from the city centre to Juan Álvarez international airport. Jams are frequent on the section of road between Acapulco Bay and the Diamante and Puerto Marques suburbs, which currently means climbing La Escénica. To tackle the problem the city authorities decided to build the new tunnel and bypass the traffic jams. The route of the 3.2km tunnel runs under the Cumbres de Llano Largo mountain.

The contract for excavating the two tunnels was awarded to the Aca-Túnel consortium, which comprises the privately held firms 2765 ICA and CARSO, two of Mexico’s key contractors.

Maquinter, Indeco’s distributor in Mexico, sells and rents out construction machinery equipment in various different states in the country. The consortium, Aca-Túnel, sent the distributor a provisioning request for Indeco hydraulic breakers. Indeco units had recently been used successfully by ICA in Oaxaca State on a road-building project, which strongly influenced the decision to opt for breakers from the same supplier. The two HP 3000 ABFs (HP 5000s in the US), have been mounted on 178 Caterpillar 320 excavators.

“Tunnelling is a particularly tough application for hydraulic hammers, due to the special conditions they are required to work under,” explained Indeco’s marketing manager Michele Vitulano. In tunnelling jobs there is more dust around the breaker than for quarrying work, due to the enclosed nature of the operating area. To prevent the risk of extra wear, additional water damping and tool greasing technology is often used in tunnelling jobs. Working temperatures can also be higher in tunnelling as there is less airflow, so hydraulics need extra cooling. And as breakers often have to be operated horizontally or even pointing upwards in tunnelling work, further measures are needed to provide protection for the internal working components.

However, as hydraulic breakers have been used successfully in Italian tunnelling projects for many years, Indeco has plenty of experience in configuring its units for use in this type of application

For more information on companies in this article

Related Content

  • RDS extends product range with exclusive distribution deals
    April 23, 2015
    Demolition, recycling and environmental equipment specialist RDS has extended its product range with several distribution deals that include shears, hydraulic breakers, dust controllers and asphalt recyclers. RDS is now the exclusive distributor in France for the Rotar range of shears, cutters, grabs and shovels. This includes the Rotar Scrap Shear that features a powerful cylinder combined with an integrated speed-valve to produce a strong cutting force. The product’s well-balanced hydraulics and heavy
  • RDS extends product range with exclusive distribution deals
    January 6, 2017
    Demolition, recycling and environmental equipment specialist RDS has extended its product range with several distribution deals that include shears, hydraulic breakers, dust controllers and asphalt recyclers. RDS is now the exclusive distributor in France for the Rotar range of shears, cutters, grabs and shovels. This includes the Rotar Scrap Shear that features a powerful cylinder combined with an integrated speed-valve to produce a strong cutting force. The product’s well-balanced hydraulics and heavy
  • A slow start for Mexico’s Atizapan-Atlacomulco highway
    June 9, 2015
    Almost one year after work started on Mexico’s Atizapan-Atlacomulco highway, little progress appears to have been made. OHL Mexico, a subsidiary of the Spanish construction firm OHL group -- Obrascon Huarte Lain -- said that the apparent lack of progress is due to the government not having arranged access to the road. Sergio Hidalgo, director general for OHL Mexico, told investors that the land for the first of three stages of the project, covering 25km between Atlacomulco and Ixtlahuaca was released
  • Progress being made for key Chile mega projects
    February 22, 2016
    Progress is being made in Chile for two key mega projects, the Chacao Bridge and the El Melon Tunnel. Chile's Ministry of Public Works (MOP) has ordered the consortium working on the Chacao Bridge project to carry out additional studies. The consortium comprises Systra, OAS, Aas-Jakobsen and Hyundai and the project is worth US$511.45 million. The consortium has to respond to observations made by the MOP on the design proposal presented in August 2014. The works to build the bridge now look likely to continu