Skip to main content

Mexico’s longest tunnel project being excavated

Congestion is particularly bad on the road from the city centre to Juan Álvarez international airport. Jams are frequent on the section of road between Acapulco Bay and the Diamante and Puerto Marques suburbs, which currently means climbing La Escénica. To tackle the problem the city authorities decided to build the new tunnel and bypass the traffic jams. The route of the 3.2km tunnel runs under the Cumbres de Llano Largo mountain. The contract for excavating the two tunnels was awarded to the Aca-Túnel con
July 18, 2017 Read time: 3 mins
Indeco has experience in configuring its breakers for use in tunnelling
RSSTwo specially configured hydraulic breakers from Indeco are being used in the project to construct Mexico’s longest tunnel. The HP 3000 ABF units are being used at the Aca-Túnel jobsite in Acapulco to help build the new tunnel, which is intended to reduce congestion in one of Mexico’s most popular tourist destinations

Congestion is particularly bad on the road from the city centre to Juan Álvarez international airport. Jams are frequent on the section of road between Acapulco Bay and the Diamante and Puerto Marques suburbs, which currently means climbing La Escénica. To tackle the problem the city authorities decided to build the new tunnel and bypass the traffic jams. The route of the 3.2km tunnel runs under the Cumbres de Llano Largo mountain.

The contract for excavating the two tunnels was awarded to the Aca-Túnel consortium, which comprises the privately held firms 2765 ICA and CARSO, two of Mexico’s key contractors.

Maquinter, Indeco’s distributor in Mexico, sells and rents out construction machinery equipment in various different states in the country. The consortium, Aca-Túnel, sent the distributor a provisioning request for Indeco hydraulic breakers. Indeco units had recently been used successfully by ICA in Oaxaca State on a road-building project, which strongly influenced the decision to opt for breakers from the same supplier. The two HP 3000 ABFs (HP 5000s in the US), have been mounted on 178 Caterpillar 320 excavators.

“Tunnelling is a particularly tough application for hydraulic hammers, due to the special conditions they are required to work under,” explained Indeco’s marketing manager Michele Vitulano. In tunnelling jobs there is more dust around the breaker than for quarrying work, due to the enclosed nature of the operating area. To prevent the risk of extra wear, additional water damping and tool greasing technology is often used in tunnelling jobs. Working temperatures can also be higher in tunnelling as there is less airflow, so hydraulics need extra cooling. And as breakers often have to be operated horizontally or even pointing upwards in tunnelling work, further measures are needed to provide protection for the internal working components.

However, as hydraulic breakers have been used successfully in Italian tunnelling projects for many years, Indeco has plenty of experience in configuring its units for use in this type of application

For more information on companies in this article

Related Content

  • Mexico’s road crisis from poor maintenance
    May 5, 2017
    Mexico’s road network is suffering a crisis due to a sustained period of poor maintenance and underfunding. This is the finding of the Mexican Secretariat of Communications and Transport (SCT). Its report reveals that almost 113,000km of the country’s federal road system, around 30% of the entire network, is in need of repairs or upgrades. Poor road conditions have slowed vehicle speeds on the network and also been the cause of crashes, an issue SCT is keen to alleviate. However the combination of insuffici
  • Controlled demolition development
    January 25, 2017
    The development of reliable hydraulic attachments has brought a revolution in demolition technology. The hydraulic breaker, pioneered by the Krupp and Montabert brands, has firmly taken hold with a huge range of manufacturers now offering machines. Hydraulic attachment specialists such as Atlas Copco, Indeco and Sandvik (with its Rammer brand) now offer a range of tools that can deliver high efficiency and safety in demolition work. Meanwhile, developments with smaller tools offer productive methods for rep
  • Bridge demolition easier with modern machines
    February 23, 2012
    The speedy and safe removal of old or unwanted structures is made easier with modern, sophisticated equipment, Patrick Smith reports. The power and versatility of modern demolition tools and machines was demonstrated when a bridge was removed overnight as part of a motorway widening project.
  • Solution found for Colombian tunnel project?
    March 12, 2015
    A solution seems to have been found for Colombia’s long-running La Linea Tunnel project. Work has been delayed on the tunnel for a number of reasons and on a number of occasions, most recently due to funding issues. But previous delays were due to such diverse causes as technical challenges posed by the difficult conditions and a lack of suitable insurance cover. The Colombian Government has come to an agreement with the Segundo Centenario consortium building the tunnel that will see construction activity r