Skip to main content

Earthmoving solutions on Portugal's longest road

Portuguese contractor Mota-Engil Group has been awarded the construction of a 270km Douro Interior Highways project in the north-east of Portugal, one of the longest highway projects ever awarded in the country.
February 17, 2012 Read time: 2 mins
RSSPortuguese contractor 3210 Mota-Engil Group has been awarded the construction of a 270km Douro Interior Highways project in the north-east of Portugal, one of the longest highway projects ever awarded in the country.

To carry out the demanding earthmoving works involved, it called on 178 Caterpillar's Portuguese dealer Barloworld STET for a solution, and this led to a deal for more than 40 Cat machines.

"Mota-Engil contacted us with several requests. Rather than negotiating individually each item, we asked for its overall budget and objectives, and came up with a proposition that covered all their requirements. We were able to meet all its needs from new and used equipment to work tools, service and finance, all in a single package, under one budget. This, what we call a 360 solution, is very advantageous for any contractor," explains Vasco Santos, commercial manager from Barloworld STET.

The deal with Mota-Engil includes three Cat 323D L and two 336D LME medium size hydraulic excavators and three 345D LME and one 365C LME large hydraulic excavators. Five CS76 XT soil compactors, four D6T and one D5K track-type tractors are also included in the package, along with six 730 articulated trucks, two 772 off-highway trucks and others.

In addition to the new equipment, the order incorporates seven used 740 articulated trucks and two pre-owned D8T track-type tractors. All machines are Cat Certified Used products and as such carry a full Cat warranty.

"The 360 solution was the best option for Mota-Engil because it provided us the needed equipment to get the job done with high quality standards. This solution was the one we were seeking due to the advantages of the financial model proposed. We chose Barloworld STET also because we recognise the capabilities of the company in performing the maintenance operations that can eventually be necessary, as well as training for our workers so that we can obtain the best results when using the Cat equipment." says Carlos Mota Santos, board member, Mota Engil.

Mota-Engil was awarded the total 270km of the Douro Interior Highways project, out of which about a third is sub-contracted. The rest, the most challenging sections, Mota-Engil will carry out itself. This means more than 20m³ million of earthmoving; 1,100km of drainage and in excess of 1 million tonnes of coated macadam. Around 145 overpasses and underpasses will also be constructed, along with 30 bridges and viaducts and one tunnel at Bornes. In addition, 28 interchanges with local highways will be constructed to join the new highway into existing infrastructure.

For more information on companies in this article

Related Content

  • New solutions for 3D concrete paving controls
    February 20, 2012
    In concrete paving, Leica Geosystems has long held the dominant position in the market for stringless 3D controls. The company's products are well-accepted by contractors and have been used on an array of machines from different manufacturers with a high degree of success in recent years. GOMACO has been working with Leica Geosystems for some time and the two companies set up a partnership recently. This combination technology and business relationship has seen the placement of personnel from Leica Geosyste
  • Bulgaria: back on track?
    July 23, 2012
    Several important Bulgarian road projects are expected to gain momentum over the coming weeks, a welcome boost for a sector that has been beset by delays in the past. In mid-September, the National Road Infrastructure Agency (NRIA) announced that it would soon be declaring new tenders for the construction of two key road projects worth a total of US$94 million (approximately €68.8 million). One section will link the south-eastern city of Kardzhali to Podkova, near the Greek border: the second will connect t
  • Improving road drainage in Iowa
    August 17, 2015
    In Iowa, the Simex CT 2.8 vibrating compactor wheel is playing an important role in building a subsurface, road drainage system The topsoil of Iowa is famous for its fertility, a characteristic that explains the high agricultural productivity of this state located in the American Midwest. However, the composition of the soil lends itself poorly to the dispersal of rainwater, as its fine granulometry and low level of permeability (12.7cm/hour according to the American Association of State Highway and Tran
  • Concrete dowel drilling systems can face tough construction challenges
    November 13, 2014
    Nebraska Highway 92 in the US stretches from Nebraska’s western border with Wyoming to Omaha where the highway leaves Nebraska and enters Iowa, taking motorists through farmland and several towns and counties across the state. It’s also a major roadway that branches off from Interstate 80 and leads motorists through Polk County, Nebraska, where a recently completed road project is enhancing safety for motorists.