Skip to main content

Earthmoving solutions on Portugal's longest road

Portuguese contractor Mota-Engil Group has been awarded the construction of a 270km Douro Interior Highways project in the north-east of Portugal, one of the longest highway projects ever awarded in the country.
February 17, 2012 Read time: 2 mins
RSSPortuguese contractor 3210 Mota-Engil Group has been awarded the construction of a 270km Douro Interior Highways project in the north-east of Portugal, one of the longest highway projects ever awarded in the country.

To carry out the demanding earthmoving works involved, it called on 178 Caterpillar's Portuguese dealer Barloworld STET for a solution, and this led to a deal for more than 40 Cat machines.

"Mota-Engil contacted us with several requests. Rather than negotiating individually each item, we asked for its overall budget and objectives, and came up with a proposition that covered all their requirements. We were able to meet all its needs from new and used equipment to work tools, service and finance, all in a single package, under one budget. This, what we call a 360 solution, is very advantageous for any contractor," explains Vasco Santos, commercial manager from Barloworld STET.

The deal with Mota-Engil includes three Cat 323D L and two 336D LME medium size hydraulic excavators and three 345D LME and one 365C LME large hydraulic excavators. Five CS76 XT soil compactors, four D6T and one D5K track-type tractors are also included in the package, along with six 730 articulated trucks, two 772 off-highway trucks and others.

In addition to the new equipment, the order incorporates seven used 740 articulated trucks and two pre-owned D8T track-type tractors. All machines are Cat Certified Used products and as such carry a full Cat warranty.

"The 360 solution was the best option for Mota-Engil because it provided us the needed equipment to get the job done with high quality standards. This solution was the one we were seeking due to the advantages of the financial model proposed. We chose Barloworld STET also because we recognise the capabilities of the company in performing the maintenance operations that can eventually be necessary, as well as training for our workers so that we can obtain the best results when using the Cat equipment." says Carlos Mota Santos, board member, Mota Engil.

Mota-Engil was awarded the total 270km of the Douro Interior Highways project, out of which about a third is sub-contracted. The rest, the most challenging sections, Mota-Engil will carry out itself. This means more than 20m³ million of earthmoving; 1,100km of drainage and in excess of 1 million tonnes of coated macadam. Around 145 overpasses and underpasses will also be constructed, along with 30 bridges and viaducts and one tunnel at Bornes. In addition, 28 interchanges with local highways will be constructed to join the new highway into existing infrastructure.

For more information on companies in this article

Related Content

  • The world’s longest suspension bridge
    June 24, 2024
    The world’s longest suspension bridge is the 1915 Çanakkale Bridge in Turkey. This engineering marvel links Gelibolu with Lapseki, forming a key section of the 101km highway linking Malkara with Çanakkale. *Article produced in partnership with the General Directorate of Highways (KGM), Ministry of Transport and Infrastructure, Republic of Türkiye.
  • Higher production from all-wheel-drive haulers
    August 2, 2012
    The improvements to articulated dump trucks (ADTs) have been substantial in recent years. Comparing a present day machine with one from 20 or even just 10 years ago shows how far design has come. Major improvements have been made in visibility, operator comfort levels, rough terrain performance, driveline efficiency and productivity, to name but a few key areas. All of the latest generation ADTs available on the world market now come with Tier 3/Stage IIIA compliant diesels that produce far lower noise and
  • New traffic solutions for the UK
    July 15, 2015
    Two major developments being introduced will help optimise traffic flow on routes carrying high volumes of vehicles/day. An installation of Flexicon’s flexible conduit will help keep the traffic flowing on one of the busiest sections of the M6 motorway through Birmingham by protecting power and data cabling for overhead gantries and CCTV cameras. On behalf of Highways England, who is implementing a hard shoulder running scheme between junctions 5 and 8, contractor’s Carillion is using the 63mm diameter L
  • Heavy work for Cat 730C Ejector Truck on English bypass
    December 18, 2017
    When Flannery Plant Hire was awarded work on the Norwich bypass project, they purchased a wide range of new Caterpillar machines. Caterpillar dealer Finning UK & Ireland supports construction of the Norwich Bypass, one of the UK’s largest road infrastructure projects, with a vast range of Caterpillar machines and advanced Caterpillar Production Management - CPM. Known as the Northern Distributor Road, the project is managed by primary contractor Balfour Beatty, with P. Flannery Plant Hire as main earthwork