Skip to main content

Earthmoving solutions on Portugal's longest road

Portuguese contractor Mota-Engil Group has been awarded the construction of a 270km Douro Interior Highways project in the north-east of Portugal, one of the longest highway projects ever awarded in the country.
February 17, 2012 Read time: 2 mins
RSSPortuguese contractor 3210 Mota-Engil Group has been awarded the construction of a 270km Douro Interior Highways project in the north-east of Portugal, one of the longest highway projects ever awarded in the country.

To carry out the demanding earthmoving works involved, it called on 178 Caterpillar's Portuguese dealer Barloworld STET for a solution, and this led to a deal for more than 40 Cat machines.

"Mota-Engil contacted us with several requests. Rather than negotiating individually each item, we asked for its overall budget and objectives, and came up with a proposition that covered all their requirements. We were able to meet all its needs from new and used equipment to work tools, service and finance, all in a single package, under one budget. This, what we call a 360 solution, is very advantageous for any contractor," explains Vasco Santos, commercial manager from Barloworld STET.

The deal with Mota-Engil includes three Cat 323D L and two 336D LME medium size hydraulic excavators and three 345D LME and one 365C LME large hydraulic excavators. Five CS76 XT soil compactors, four D6T and one D5K track-type tractors are also included in the package, along with six 730 articulated trucks, two 772 off-highway trucks and others.

In addition to the new equipment, the order incorporates seven used 740 articulated trucks and two pre-owned D8T track-type tractors. All machines are Cat Certified Used products and as such carry a full Cat warranty.

"The 360 solution was the best option for Mota-Engil because it provided us the needed equipment to get the job done with high quality standards. This solution was the one we were seeking due to the advantages of the financial model proposed. We chose Barloworld STET also because we recognise the capabilities of the company in performing the maintenance operations that can eventually be necessary, as well as training for our workers so that we can obtain the best results when using the Cat equipment." says Carlos Mota Santos, board member, Mota Engil.

Mota-Engil was awarded the total 270km of the Douro Interior Highways project, out of which about a third is sub-contracted. The rest, the most challenging sections, Mota-Engil will carry out itself. This means more than 20m³ million of earthmoving; 1,100km of drainage and in excess of 1 million tonnes of coated macadam. Around 145 overpasses and underpasses will also be constructed, along with 30 bridges and viaducts and one tunnel at Bornes. In addition, 28 interchanges with local highways will be constructed to join the new highway into existing infrastructure.

For more information on companies in this article

Related Content

  • Bridge project uses high performing formwork
    February 20, 2012
    Doka designed and supplied a high-performing formwork technology solution for a challenging bridge project south of the German town of Halle. The 8,614m long single-cell box girder superstructure of the Saale-Elster Viaduct, with a typical cross section width of 13.9m, is borne on 220 piers, and has a constructional depth of 4m. It is mainly being erected on launching girders to minimise the impact on flora and fauna.
  • Major Europe-Asia bridge connection in Turkey
    July 1, 2014
    The 3rd Bosporus Bridge and the Northern Marmara Motorway will improve transport links between Europe and Asia and cut chronic congestion in Istanbul, Turkey’s largest city - Mike Woof reports Work is now well underway on the 3rd Bosporus Bridge and the Northern Marmara Motorway, providing a new link for Turkish city Istanbul and the region as a whole. This enormous bridge and highway project is breaking several records for Turkey in terms of scale, as well as setting a number of international records for e
  • Peru’s Matarani – Punta de Bonbon Highway
    January 5, 2016
    A major new highway project in Peru will improve connectivity for the Arequipa region - Mauro Nogarin writes Peru’s Matarani-Bonbon road project is an important route and forms part of the Camana - Dv Quilca - Ilo - Tacna highway project. The road stretches through several provinces in the Arequipa region. The deadline for completing the work is 720 days after January 2015, and it is scheduled to be completed by December 2016. Progress has been good and as of July 2015, it was 80% completed. The main
  • Olbia Airport upgrade work
    September 16, 2020
    Equipment from the Fayat Group has played an important role in the revamping of a busy airport on the Italian island of Sardinia