Skip to main content

Earthmoving solutions on Portugal's longest road

Portuguese contractor Mota-Engil Group has been awarded the construction of a 270km Douro Interior Highways project in the north-east of Portugal, one of the longest highway projects ever awarded in the country.
February 17, 2012 Read time: 2 mins
RSSPortuguese contractor 3210 Mota-Engil Group has been awarded the construction of a 270km Douro Interior Highways project in the north-east of Portugal, one of the longest highway projects ever awarded in the country.

To carry out the demanding earthmoving works involved, it called on 178 Caterpillar's Portuguese dealer Barloworld STET for a solution, and this led to a deal for more than 40 Cat machines.

"Mota-Engil contacted us with several requests. Rather than negotiating individually each item, we asked for its overall budget and objectives, and came up with a proposition that covered all their requirements. We were able to meet all its needs from new and used equipment to work tools, service and finance, all in a single package, under one budget. This, what we call a 360 solution, is very advantageous for any contractor," explains Vasco Santos, commercial manager from Barloworld STET.

The deal with Mota-Engil includes three Cat 323D L and two 336D LME medium size hydraulic excavators and three 345D LME and one 365C LME large hydraulic excavators. Five CS76 XT soil compactors, four D6T and one D5K track-type tractors are also included in the package, along with six 730 articulated trucks, two 772 off-highway trucks and others.

In addition to the new equipment, the order incorporates seven used 740 articulated trucks and two pre-owned D8T track-type tractors. All machines are Cat Certified Used products and as such carry a full Cat warranty.

"The 360 solution was the best option for Mota-Engil because it provided us the needed equipment to get the job done with high quality standards. This solution was the one we were seeking due to the advantages of the financial model proposed. We chose Barloworld STET also because we recognise the capabilities of the company in performing the maintenance operations that can eventually be necessary, as well as training for our workers so that we can obtain the best results when using the Cat equipment." says Carlos Mota Santos, board member, Mota Engil.

Mota-Engil was awarded the total 270km of the Douro Interior Highways project, out of which about a third is sub-contracted. The rest, the most challenging sections, Mota-Engil will carry out itself. This means more than 20m³ million of earthmoving; 1,100km of drainage and in excess of 1 million tonnes of coated macadam. Around 145 overpasses and underpasses will also be constructed, along with 30 bridges and viaducts and one tunnel at Bornes. In addition, 28 interchanges with local highways will be constructed to join the new highway into existing infrastructure.

For more information on companies in this article

Related Content

  • Increasing importance of alternate truck routes
    February 14, 2012
    The fabled Silk Route from China to Europe takes many forms, and is again becoming increasingly important as Patrick Smithreports The ancient Silk Road was never a single caravan route, but covered hundreds of kilometres in width extending in length for around 10,000km. This is the view of the European International Road Transport Union (IRU), and many other countries and organisations, who point out that it is a system of routes covering many countries via a series of branch roads that dates back some 2
  • Innovations in concrete paving technology
    March 16, 2012
    Paving with concrete offers a strong and long life base for a roadway, with manufacturers continuing to develop technologies – Mike Woof reports. Innovation comes fast in the concrete paving market with a number of specialist suppliers offering an array of solutions to meet the needs of slipforming contractors. These machines can be used for a range of applications from large-scale airport runway or highway construction duties, tunnel jobs, bridge decks, barriers, traffic islands and kerbs. Because the app
  • Sandvik drilling rigs boost production
    July 9, 2012
    The drill and blast contractor Technical Drilling and Blasting in the United Arab Emirates (UAE) is standardising on Sandvik rock tools for its fleet of drill rigs. The firm operates across Fujeirah, providing quality gabbro aggregates for construction projects in Dubai and Abu Dhabi. Recognised as one of the worlds hardest rocks, gabbro features a typical density in excess of 3tonnes/m, a crushing factor of 10 and a 61% silica content and demand remains strong for this quality construction material. Every
  • Road recycling developments coming to market
    March 22, 2017
    Major manufacturers are introducing new machines for road milling and recycling that will boost output and lower the cost/m - Mike Woof writes New machines for milling and road recycling will offer increased performance and productivity than earlier generation equipment. Higher quality cutting will help contractors achieve smoother surfaces and considerably lower paving costs also. Meanwhile new recycler/stabiliser machines will offer a better cost/m and improve the economics of road recycling for contra