Skip to main content

Earthmoving solutions on Portugal's longest road

Portuguese contractor Mota-Engil Group has been awarded the construction of a 270km Douro Interior Highways project in the north-east of Portugal, one of the longest highway projects ever awarded in the country.
February 17, 2012 Read time: 2 mins
RSSPortuguese contractor 3210 Mota-Engil Group has been awarded the construction of a 270km Douro Interior Highways project in the north-east of Portugal, one of the longest highway projects ever awarded in the country.

To carry out the demanding earthmoving works involved, it called on 178 Caterpillar's Portuguese dealer Barloworld STET for a solution, and this led to a deal for more than 40 Cat machines.

"Mota-Engil contacted us with several requests. Rather than negotiating individually each item, we asked for its overall budget and objectives, and came up with a proposition that covered all their requirements. We were able to meet all its needs from new and used equipment to work tools, service and finance, all in a single package, under one budget. This, what we call a 360 solution, is very advantageous for any contractor," explains Vasco Santos, commercial manager from Barloworld STET.

The deal with Mota-Engil includes three Cat 323D L and two 336D LME medium size hydraulic excavators and three 345D LME and one 365C LME large hydraulic excavators. Five CS76 XT soil compactors, four D6T and one D5K track-type tractors are also included in the package, along with six 730 articulated trucks, two 772 off-highway trucks and others.

In addition to the new equipment, the order incorporates seven used 740 articulated trucks and two pre-owned D8T track-type tractors. All machines are Cat Certified Used products and as such carry a full Cat warranty.

"The 360 solution was the best option for Mota-Engil because it provided us the needed equipment to get the job done with high quality standards. This solution was the one we were seeking due to the advantages of the financial model proposed. We chose Barloworld STET also because we recognise the capabilities of the company in performing the maintenance operations that can eventually be necessary, as well as training for our workers so that we can obtain the best results when using the Cat equipment." says Carlos Mota Santos, board member, Mota Engil.

Mota-Engil was awarded the total 270km of the Douro Interior Highways project, out of which about a third is sub-contracted. The rest, the most challenging sections, Mota-Engil will carry out itself. This means more than 20m³ million of earthmoving; 1,100km of drainage and in excess of 1 million tonnes of coated macadam. Around 145 overpasses and underpasses will also be constructed, along with 30 bridges and viaducts and one tunnel at Bornes. In addition, 28 interchanges with local highways will be constructed to join the new highway into existing infrastructure.

For more information on companies in this article

Related Content

  • Houston, Texas is seeing fast expansion of population, with in vast increases in traffic
    October 9, 2018
    The US city of Houston is expanding fast and its transport system is having to be developed to cope
  • Efficient sealcoating claimed by Neal Manufacturing
    October 20, 2017
    Neal Manufacturing is introducing a new sealcoating baffle attachment that is said to boost efficiency. A division of Blastcrete Equipment, Neal Manufacturing has designed its DA 350 Dual Applicator so that it can be retrofitted onto any truck-powered sealcoating unit. The piece of equipment can be used to automatically cut-in sealcoat materials on the go, while keeping curbs and edges free of material. The unit can be paired with Neal’s high-powered blower to further increase sealcoat preparation product
  • Bridges and tunnels tackle congestion problems
    February 29, 2012
    In preparation for the 2014 Olympic Winter Games, the Black Sea health resort of Sotschi, Russia, is tackling its growing traffic jam problems.A 13km bypass and a new main road passing mainly under the city involves the construction of 15 tunnels and a number of bridges and flyovers.
  • Conference focuses on road design software
    February 23, 2012
    Trimble Dimensions 2009 takes a hard look at opportunities in a tough economy If attendance is the standard by which user conferences are measured, then Trimble Dimensions 2009 should be considered a success. The conference, which took place from 23-25 February at the Mirage Hotel in Las Vegas, USA, hosted more than 2,400 attendees, slightly exceeding last year. The strong attendance, in the face of global economic concerns, was seen by Trimble CEO Steven Berglund as a show of support for the company's tech