Skip to main content

Compressor system reduces dust in tunnelling

Italian firm Indeco is now offering a novel compressor system that can be mounted on an excavator being used with a breaker in tunnelling operations.
February 14, 2012 Read time: 2 mins
The new compressor from Indeco can be fitted to any type of excavator requiring a water spray system for use with a breaker in a tunneling application
Italian firm 237 Indeco is now offering a novel compressor system that can be mounted on an excavator being used with a breaker in tunnelling operations. The compressor is designed to power water sprayers that help damp down dust that can be generated when breaking away rock from the face. Using the water spray system helps boost visibility for the excavator operator and allows for more efficient working. The water spray also prevents material build-ups from occurring on the breaker tool, which could result in additional wear, while it also eliminates the risk of contaminants from entering the hammer hydraulics and causing serious damage. In addition, this system improved the working conditions and safety levels inside the tunnel for any site personnel by eliminating the risk of inhaled particulates. The system can deliver a maximum water pressure of 150bars and delivers up to 15litres/min of water. The system features a novel spray design to ensure effective misting and maximise efficiency, and suits use with the Indeco HP5000, HP7000, HP9000 and HP12000 breakers.

The system is available as a standard feature for use on all excavators and suits tunnelling applications, as well as other duties such as quarrying or for pressurising breakers for underwater demolition. Indeco's marketing manager, Michele Vitulano explained, "Until now we were offering this on request for customers."

For more information on companies in this article

Related Content

  • Italian viaduct job for Conjet
    July 4, 2012
    The multi-span reinforced concrete viaduct at Torano, about 100km east of the Italian capital Rome, is a major structure on the main E80/A24/A25 Autostrada crossing central Italy. The Viadotto Fiume Salto was opened in the late 1960s, but the use of de-icing salts during winter months has since caused considerable calcium chloride damage to the structure forcing the Italian Highways Authority and the Autostrada di Parchi's owner Toto to carry out extensive repairs. The renovation estimated at around €5 mill
  • Bretec breaker boosting Brazilian productivity
    May 15, 2015
    Brazilian cement maker Brennand Cimentos now boasts a Bretec Breaker to boost efficiency A Bretec breaker has been used to solve a production problem at a materials operation in Brazil. Brazilian cement producer, Brennand Cimentos, has recently purchased a Bretec L20 hydraulic hammer. The unit is being used to carry out secondary breaking duties and split apart boulders that are too large to be moved or crushed. Introducing the breaker has helped the facility improve operational efficiency. The 1.34tonne
  • Sandvik’s Turkish delight at groundbreaking tunnel vision
    May 20, 2014
    Turkey’s longest, and what will be the world’s fourth longest, highway tunnel is being built under Mount Ovit in the northeast of the country. Sandvik Construction is playing a vital role in the construction of the giant new structure, which will enable all-year-round access to what is a relatively remote and often snow-blocked part of Anatolia Having had their freedom of movement blighted for many years by wintertime snow blocking the D925 highway, along with narrower roads and passes, at Mount Ovit, resi
  • Noise reduced cab for latest soil compactors
    March 14, 2012
    The new noise-damped cab for Volvo‘s single drum soil compactors is said to make the machines more comfortable to operate for a full working shift. The comprehensively redesigned one-piece cab is now fitted on Volvo’s latest SD70, SD77, SD115, SD130 and SD160 single drum soil compactors. The noise damping is said to radically reduce the sound levels at the operator’s ear, which is said to cut fatigue levels over the full working shift.