Skip to main content

Compressor system reduces dust in tunnelling

Italian firm Indeco is now offering a novel compressor system that can be mounted on an excavator being used with a breaker in tunnelling operations.
February 14, 2012 Read time: 2 mins
The new compressor from Indeco can be fitted to any type of excavator requiring a water spray system for use with a breaker in a tunneling application
Italian firm 237 Indeco is now offering a novel compressor system that can be mounted on an excavator being used with a breaker in tunnelling operations. The compressor is designed to power water sprayers that help damp down dust that can be generated when breaking away rock from the face. Using the water spray system helps boost visibility for the excavator operator and allows for more efficient working. The water spray also prevents material build-ups from occurring on the breaker tool, which could result in additional wear, while it also eliminates the risk of contaminants from entering the hammer hydraulics and causing serious damage. In addition, this system improved the working conditions and safety levels inside the tunnel for any site personnel by eliminating the risk of inhaled particulates. The system can deliver a maximum water pressure of 150bars and delivers up to 15litres/min of water. The system features a novel spray design to ensure effective misting and maximise efficiency, and suits use with the Indeco HP5000, HP7000, HP9000 and HP12000 breakers.

The system is available as a standard feature for use on all excavators and suits tunnelling applications, as well as other duties such as quarrying or for pressurising breakers for underwater demolition. Indeco's marketing manager, Michele Vitulano explained, "Until now we were offering this on request for customers."

For more information on companies in this article

Related Content

  • Clean wheel innovation
    February 6, 2012
    ITALIAN CONSTRUCTION equipment manufacturer, TowerLight, has established a special division that will focus on wheel-washing technology.
  • Mullum Mullum Valley untouched by progress
    July 20, 2012
    Preserving the unspoiled Mullum Mullum Valley was the major consideration when deciding to build a traffic tunnel The answer to one of the major issues facing construction of the A$2.5 billion EastLink route in Australia was simple: construct a tunnel. While it was expensive, those involved realised they had little option but to go underground to protect the environmentally sensitive Mullum Mullum Valley, an untouched area of wood and bushland in Melbourne. EastLink, the 39km toll road project on the easter
  • The use of telematics in construction machines is growing
    May 20, 2015
    Demand for telematics technology is growing, as equipment users begin to lean the value of these systems – Alan Dron reports With construction projects increasingly operating to wafer-thin profit margins, any technological assistance that can keep the accounts in the black is welcome. This is particularly the case with those projects where contractors can share a larger slice of the profits if they complete their work ahead of schedule. The downside, of course, is that they also share the pain if the
  • Hatz’s American launch of 4H50TIC engine at Conexpo 2014
    January 23, 2014
    Hatz is celebrating the American introduction of its water-cooled multi-cylinder 4H50TIC turbo engine at Conexpo 2014. The engine is said by the German diesel engine manufacturer to set several new standards in its class. The two-litre model became available to buy in January 2014 and has a maximum power of 55kW and a maximum torque of 240Nm. Including starter and alternator, the 4H50TIC weighs just 173kg, said by Hatz to be a saving 90kg compared to its next competitor. As a result, the engine is said by