Skip to main content

XCMG excavators helping build roads in Benin

Hydraulic excavators are playing a key role in building roads in the West African nation of Benin. One of the major projects has been for the construction of the A-B Highway in the country. A team of eight XCMG excavators has been used on the project to carry out important earthmoving duties, as well as for secondary breaking duties when equipped with hydraulic hammers. Due to the tropical climate, extensive drainage ditches are needed so as to prevent flooding during the rainy season. The eight 37tonne
December 10, 2015 Read time: 2 mins
Eight XCMG excavators have been carrying out work on Benin’s A-B Highway
Hydraulic excavators are playing a key role in building roads in the West African nation of Benin. One of the major projects has been for the construction of the A-B Highway in the country.

A team of eight 2490 XCMG excavators has been used on the project to carry out important earthmoving duties, as well as for secondary breaking duties when equipped with hydraulic hammers. Due to the tropical climate, extensive drainage ditches are needed so as to prevent flooding during the rainy season. The eight 37tonne class XCMG XE370 machines were supplied in April 2014 and have proven reliable since they were delivered.

The work is one of a number of projects that XCMG equipment has been used on outside of China. The firm says it has been expanding its overseas excavator market in recent years, with over 1,000 of its excavators operating in 27 African countries. Support for the units is provided by overseas service engineers, with a full range of technical support, services and spare parts.

For more information on companies in this article

Related Content

  • Brine spraying can boost winter road safety and cut materials costs
    February 16, 2015
    A study on the use of a brine sprayer on the A8 Autobahn in Germany has yielded valuable data - *Jo Rommeswinkel writes. Since 2007, Autobahnplus Services (a+S) has been providing the operation and maintenance services on the 52km concession Autobahn A8 between Munich and Augsburg in Bavaria, a region renowned for its severe winter maintenance conditions. The Munich Augsburg section comprises 48km of six-lane dual carriageway and 4km of four-lane dual carriageway. Part of the road surface consists of low-no
  • Strong attendance points to a successful bauma China show
    December 17, 2014
    Even heavy rain showers on the first day of the bauma China exhibition in Shanghai did not dissuade the crowds packing the outside exhibition areas - Mike Woof writes Those firms exhibiting at bauma China 2014 in Shanghai benefited from a strong show that attracted a record attendance of 191,000, an increase of 6% over the 2012 event. A wide array of new equipment was on show from the 3,104 firms exhibiting, an increase of 14% from 2012. There was a strong focus on technology and new engines required for
  • Upgrading a busy A road link in the UK
    July 4, 2018
    The upgrade to the UK’s busy A14 route will address a significant traffic bottleneck - Mike Woof writes The UK is suffering badly from traffic congestion, a problem that is particularly severe in and around its major cities. Lack of investment in road construction over many years has resulted in a major backlog of work, while the country has seen growing vehicle numbers. To make matters worse, there have been few additions to the major road network since the late 1980s and early 1990s. And the combinatio
  • Challenging Colombian tunnel completed
    May 30, 2024
    A tunnel stretch on Colombia’s Santa Fe - Cañasgordas highway is complete – Mauro Nogarin reports